Project overview

Tower 28 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009511. Tower 28 is located at 9Aycpmuvyqysmeex/S/R2kt5nxet9jg8wvyi+Ihpacc=. This is a Ongoing being developed by Shiv Shakti Builders And Developers.

Tower 28 has 2 BHK Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 321 of which 11 are currently available for sale.

Tower 28 is being developed on a total land area of 120664 Sq.ft. out of which 8814 Sq.ft. i.e 7% is reserved for recreational purposes. Tower 28 has 7 Wings / Towers A Wing,B Wing,C Wing Referred In Ii Phase,D Wing,E Wing,F Wing Referred In Ii Phase,G Wing Referred In 2Nd Phase

ProjectDeveloperLocationPossession
Redevelopment Of Lamplight ChslShree Mahavir Estates0Jtqcl24amcoeiaqtcnziczewcecssjzd3eei3pjr6xqdhv3gg4cvyjrqpdihwtw31-12-2019 00:00:00
Kush PrestigeKush Buildcon LlpCihf2iymxv5edrnds4omba==31-12-2017 00:00:00
Aaditya PlazaJet Build Developers(Mumbai)Jaysmgcxhhtjurcmxrimjzhxpu3q5c76dql5is+Y5hruaogict6tirkp4emxfge731-12-2018 00:00:00
Makarani Pada Phase 1K D BuildersR7ypyvzwki6brp/Mgv8ygndegowde5reoc1lsyhybkjmommyc8ksb46f2f4flccleqmp3axu9b7jcynpwxdixr+Juyt9at/Pwuh1lj+Mkn8bjww7ckvqjm5telfodunxduikamv5fkjj7bbeubhsdw==30-03-2024 00:00:00
Chaurang Sunshine Chaurang BuildersWc2rdd6uh0qtrexq/Gfe/A==31-05-2018 00:00:00
Asmita Sand DunesSun DevelopersG4z4tiqjjnh9i0d+Wyigvmo+Oattd2ddqrvhzwa+Oxi=30-06-2019 00:00:00
Express Zone B WingCello Sonal ConstructionZapkitd4l1wt69m3d1txuckzt16cy4tbyvn8jzfax4vrllrxrip7olz62arnzeir93l4fnc+Aloars3kal9xya==30-06-2024 00:00:00
Sri Balaji EnclaveAni Anu Developers Private LimitedYmruiexxe1dz1ikp/H1kfuigdg8h/Xgo6pt2ksaac1c=31-12-2019 00:00:00
Sheetal Om Jay AradhanaD.G.Land Developers Private Limited8D/1O2+Qvx2fb9yg4zhl0a==31-12-2018 00:00:00
UjvalParanjape Schemes (Construction) Ltd5Bnhjlunipbuxyhl/Ncezozpo0xu6ti9v+Cdjojc8tuujlgmndis1lswwd6nhk2oao7ug0+Qokryfg7mdlobia==31-12-2019 00:00:00
Om HeightsKosmos &Amp; Apple RealtyMalad31-12-2020 00:00:00
Shah Arcade IiiShah Housecon Private LimitedNv+Hlot72uveag01voi30xozy9sqgnvwprzx2e/2Swyjmux9tesrf2xig1il0lhyiewsmguezmmjh/Tpzf32jcbayqieusi25x1ilwy8leruqpgvmleyrlpwpqo+Pqcu5adaqc/2Qarjnuskb5yqwa==30-07-2018 00:00:00
Saptaratna TowersRaja Constructions CompanyDyrolo0on/4Bhivnvxsfla==31-12-2017 00:00:00
Romell Aether Wing B 2-Phase 2 34Th To 39Th FloorsRomell Properties Private LimitedOqto+Xrtkmhgqkgr/Rptlg==30-12-2025 00:00:00
Atharva ComplexAtharva RealtorsPodar Road31-12-2016 00:00:00
AstrumUpvan DevelopersZiuqdfazj5saj8c8l9pgqrqua89dxodyil8q+Uu0xxg=31-12-2024 00:00:00
Redevelopment Of Gala Apartments ChslPranav Constructions LimitedVlcohnfo1zsk6canm3rhpq==30-09-2024 00:00:00
Malad Rajesh Park Chs LtdMs DevelopersZtsddvytxpnlkgp9uomrcw==31-12-2025 00:00:00
Tower 28Shiv Shakti Builders And Developers9Aycpmuvyqysmeex/S/R2kt5nxet9jg8wvyi+Ihpacc=30-06-2022 00:00:00
Crystal PrideCrystal Construction CompanyE+Dng3s2s8s/Jb31lbb3rq9swzuq25abh0uqwqdwzji=31-12-2019 00:00:00
Udyam Kunj Chs Redevelopment Phase IMahendra Mhatre40009731-12-2017 00:00:00
Upper East 97Prima Terra Buildtech Pvt. Ltd.Vhz43tzmdn99yp4yganhmg==30-12-2022 00:00:00
Redevelopment Of Niwara Co-Op Hsg Society LtdThe Niwara Co-Operative Housing Society LtdEh11unrtyapfdmvl8gb3zq==30-06-2024 00:00:00
Das Bhavan ChslRishabraj Estate Developers Pvt LtdGsf/Spodyxpwepdw61kceg==31-12-2017 00:00:00
Om HeightsOm Shiv Construction CoMumbai Suburban, 40005813-10-2020 00:00:00
Vora AashishVora Estate DevelopersMumbai Suburban, 40009731-12-2020 00:00:00
Divyam ResidencyBhavesh Mahendra MehtaH6f2vlvkdu0h37gnn3ei3kmcyn9fp4ac8wvjlxmpi5i=31-12-2017 00:00:00
Harshail Emerald ApartmentHarshmaan Spaces LlpWyfilv/Zegcgzh3joq5rvw==31-01-2027 00:00:00
Solitaire Sardar Ugam SadanSolitaire Builders And DevelopersD4fnkj2t6fy1l2ug0a6jxemd728afw+Pgkbrakflkpbrr43enur6yxs7zn6zq9bwyuubfbphrt3r1w2srvqxigurafzysrworpshkykpnmwrlan3cgbfiew+Kjexllxmakbkbjlygfhuvnp/Uymbovpdt2dugroymfbflu53rlaspk/Vj/Xzt+/Mprktlx5mfhrfr4yfjmsgk86wbu58v30s4+P5tq7ggz5embyqhsam6nxnm+Fnlxjtobxldlhu3nsbpwwdof0xgpv4jeboyq==31-12-2028 00:00:00
Pearl GardensShiv EnterprisesYtiak8ruil/10Is3b4b5jw==31-12-2026 00:00:00
Malad Amar Co-Operative Housing Socity Ltd.Ardhya Universal LlpG9smcpplggejshlzdpddcq==31-05-2025 00:00:00
VivantaKeyland Developers Private Limited+F+Jv4qmuan8t+T63cv9ew4ygpc6bk3ddw/Yzy/Nhl4=31-12-2029 00:00:00
Avalon ResidencyAvalon Residency LlpZ/Mwxj2bgu4kchtbn83e6namox7mcxamsvaa2vdlyagmc2gb3esqynik/Ntz23+8Ntsnuo5kbfnc+Bqxrz0uvnvlb/Kmnzf7mrsmrjkp70fsl0qqhdyh6zqbpncrjagohvyjbjcmiqpqyf/Rr6f7yw==31-05-2028 00:00:00
Chandraraj ComplexShree Sai Shraddha AssociatesL7jrllvrtn3gwcg0zrbqbq==20-03-2018 00:00:00
Navjeevan HeightsKonark Shakti Group Of Companies1Tk7ldu7x7ws1gtqwf3dwg==30-09-2018 00:00:00
Raj Rani PrideGeetaraj RealtorsDxp+Q8fqfkfi/Cca41cj2hevv97rtwdg61roz9ylm1m=31-12-2020 00:00:00
Western WoodsKarmvir Mumbai Housing Private LimitedLrj+F2kjayvoaqgk4a7/Xw==31-12-2018 00:00:00
111 Hyde ParkMdm RealtyNgwwat7ojyvhn5mebfy+Eq==30-06-2022 00:00:00
Onyx Apartment - Redevelopment Of Kunfayakun Chsl BuildingRefab Construction (India) Pvt. Ltd.Daufhe+Gqhl0g76v8prb0a==31-01-2018 00:00:00
Sun-Vision AvenueWoodland Constructions Pvt Ltd400064, Mumbai Suburban31-03-2018 00:00:00
Saylee EnclaveFunsign Housing Pvt. LtdJ+U8wf5tzsdsia3olbdsdzcos+Cicy4s5uaknuu++Cg=30-10-2021 00:00:00
Sheetal Vaibhav KutirD.G.Land Developers Pvt LtdKmqwjkaafu5+Njx8hk5d2q==01-07-2023 00:00:00
Mandlik Nagar Chs Ltd Phase Ii Rehab Wing E Pt And FTriumph Builders Llp3Lqp/Tvjdapr+Blk3boujq==31-12-2018 00:00:00
Om Ganesh KrupaDharma ConstructionVffno/Immhjfsdkcnmojtq==30-06-2019 00:00:00
Madhav RealityJayesh Hiralal GothiPtyfmhlfj3ki+1Vrgilrk2cjrleqa2kiuam6wzumqwmloegv2tmhf+Raqpi2j1pi15-06-2022 00:00:00
Redevelopment Of Abhiram ChslPranav Constructions Limited3/Gbazflug7zwe3+P44a4w==01-06-2023 00:00:00
63 Goldmedal AvenueRishabraj Estate Developers Pvt LtdDf5c2znv+Shirw9nrgr4gg==30-05-2027 00:00:00
Triumph TowersTriumph Builders LlpHswyezz7xftrqhov5x7y2q==30-06-2023 00:00:00
Redevelopment Of Rushabh Mahal ChslPranav Constructions LimitedWquiiz1q8tweptm+Vzuv+Jiiy8e8ifraysoqfikhfdy=30-06-2025 00:00:00
NavlabhSomnath ConstructionsIoneqnx4yazgbs2mivpspg==30-09-2025 00:00:00
Malad Sati Darshan Chs Ltd.Goyal Sati Darshan LlpS13zq7nq9v6ibvstkswykw==31-05-2026 00:00:00
Romell Aether Wing B1Romell Properties Private LimitedLpwj592wwk1rod3gljpaaa==30-12-2021 00:00:00
Sanghvi JewelSanghvi RealtorsZgwq3hgmcuxxilcvckr+7Ixbigk9ut6hwrw3ux80e7jm6xwgh2u0/Iyzrc6za4sxahmsrb9rpflx2he9jyhy+Yu7ie19hn6uo1acw6riveqh5c0vku+Gvodiujffkgvp31-12-2018 00:00:00
Rishabraj SujaiRishabraj Estate Developers Pvt LtdFi7t10dzd3/Bi8t0vrwqyplukxmr0bg/I9m5ytgvjt7malk4ftpmy9lnndk92u5k31-08-2024 00:00:00
Kojar ImperiaKojar RealtyCb539w/Odcarecg75oxcla==31-12-2024 00:00:00
Redevelopment Of Malad Marudhar ChslPranav Constructions LimitedC+3+Xjdewqhwjfcsnsvvtw==31-01-2025 00:00:00
Parekh CelesteYash Akar Developers LlpLwuoxeoelzfusayrxarjbw==30-04-2027 00:00:00
Chandak TreesourusChandak Realtors Private LimitedW7c329/Uw4iussibbdpnfoe28bxbngaow4wgwsagjj6obowov/Hs9hkhm+Fddx4evvpwcu2gag2e+Kvcv6rd8w==31-12-2028 00:00:00
SmritiMahesh Balkrishna SambhusLu6zipklsquudyzpzszg/W==31-03-2026 00:00:00
Hiramani EnclaveDamji Hirji & CompanyTsb0zzug7emsgsgclxu8hnpcm88ebafockwoqahqs/O=01-06-2019 00:00:00
SolitaireSolitaire ConstructionsX1dou0qqppma90qcgfiejkydbwzols7oxvxq9hxs14/Ayl+Wsqayamrrojwud9u9mzt4qymvbgv2lykse7u1lq==31-03-2019 00:00:00
Victory DivineYashodanand RealtorsOi9nvda8p/Nwqyzgmwbyba==30-09-2020 00:00:00
Sheetal AnupamDgs Township Pvt LtdRrwhhu5rq1ekpal4hujupxc7vkvza83vhuwwedsffym=15-05-2025 00:00:00
Asmi Business CentreAsmi Corporation01Upmeic575dul4ocrl0l+D5ky8c9qu/Wmjvb52tqtfzhk9uxuttk/N7zlpjmypala4euayz7akg0czn5yxcwa+0Une8ozkzkbuo5g6mbes=31-12-2025 00:00:00
Rashmi SignatureModi's Navnirman LimitedUkeobenuzdmptmfmxf8q5q==11-08-2027 00:00:00
Navkettan PushpaanganPriti Constructions Private LimitedWkz6jbxdhkcmyymgluojpjltzg2gxkthin5bsrq9byihfxlg+Kalthk9cvi1zgzb31-03-2028 00:00:00
Bag-E-Noor ChslMozaic Homes (India) Llp/8Ykepywryd5mjnwojfqpa==31-03-2028 00:00:00
Laxmi MadhuvanLaxmi Leela Buildcon LlpDkuy5ey2qnez+R0jpxrlta==31-05-2027 00:00:00
Redevelopment Of Malad Rajhans ChslPranav Constructions LimitedY5ivfntivc0wskv88xgb5dgnxfbjzoha1dkf2ryfrkbugvpyoy2bo4k000dic1klufhj0k6dqooqiujsx8ckag==31-03-2019 00:00:00
Nivetia HeightsKbs Properties Pvt Ltd94Bjigwmkn0ed6xfiqyxbodrbk0soej6zsls75lzxhm=30-06-2027 00:00:00
Atlanta Estate ExtensionAtul Raj Builders Pvt Ltd400063, Mumbai City30-06-2011 00:00:00
Mangal Business Park - Gautam ApartmentMangal Buildhome Private Limited64Vek2mbzoiu6/Qp/Mp07w==31-03-2027 00:00:00
La BellezaQaswa EnterprisesOrlycqe2eslkiiwtg0glaq==28-10-2028 00:00:00
Shakuntala SadanD R DevelopersBqbuvpm1yz9iixhguuwraw==31-12-2028 00:00:00
Romell AsravaRomell Realtor Developers Private Limited3Aueva70q4o3v2ump4g1isb9dkf26grlscisqoxqouisrre0vut4eqt4m/Ls/Qnj31-12-2028 00:00:00
Imperial Hava HiraShree Sai Realty31-07-2026 00:00:00
Deep ShikharShree Ram Krushna Spaces Llp31-03-2029 00:00:00
Pearl SolitairePearl Infra15-12-2030 00:00:00
Leela AashishLeela Creators400097, Mumbai Suburban31-12-2020 00:00:00
Chandak StellaSaroj Landmark Realty LlpFvir+J4fff6tgncdmok5paxjaki71d5tvnhuptwyebkyggjomrynbz3zdjnabz+A28f5zyxi+50Crf2s/O/Fvq==30-03-2022 00:00:00
Vastunemi Good Luck ApartmentVastunemi Buildtech Llp31-12-2028 00:00:00
Metro Marvel'sMetro Associates31-08-2028 00:00:00
Vir ParadiseJkd Engineers And Infrastructure Private Limited1U/Zmdyaybyezy8b31qkuyhghnano7xtpw/R5hgm5c4=30-11-2027 00:00:00
Celestial Heights - Phase IiAyyappa Developers Pvt. Ltd.3Eizcnxrnxupa7xpsi7etum9frlb8/P7lfhnp3gxsihsfvk0jru6/Fymp/Q5rdbp31-12-2029 00:00:00
Project Details
  • Project:
    Tower 28
  • Location:
  • 9Aycpmuvyqysmeex/S/R2kt5nxet9jg8wvyi+Ihpacc=
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Shiv Shakti Builders And Developers
  • Phone:
  • Address:
  • Shankar Dham - 2
Project RERA Details
MAHA REARA No: P51800009511
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Dot T Architects
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession 31 Dec 2024
Litigations No Litigations
Last Modified 21 Mar 2025
Last Retrived 13 Feb 2026
Tower 28 QR Code
Tower 28
MahaRERA - P51800009511
Apartment Details & Configuration
TypeArea
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )
1 BHK42.18 Sq.mts. ( 454 Sq.ft. )
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )
2 BHK0 Sq.mts. ( 0 Sq.ft. )
1 BHK40.51 Sq.mts. ( 436 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tower 28last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Reliance Approval
Elevator
As Per Approved Make
Energy management
Na
Entrance lobby
As Per Approved Make
Fintness Center
As Per Approved Make
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Shrubs And Plants
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Mcgm Connection
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Drainage Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Mep Drawing
Water Conservation, Rain water Harvesting
Na
Water Supply
Mcgm Supply
Buildings / Wings in Tower 28
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tower 28 by Shiv Shakti Builders And Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

120664 Sq. ft.

Project Area

8814 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

321 apartments in total
Total
321
Booked
310
Available
11

Saleable Area Statistics (Sq. ft.)

170206 Total
Total
170206
Booked
164852
Available
5354
Total 321 apartments in project. 310 apartments booked. 96% apartments booked.
Total 170206 Sq.ft. saleable area. 164852 saleable area booked.
97% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )20
19 Booked95% Booked
95% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )26
26 Booked100% Booked
100% Booked
1 BHK42.18 Sq.mts. ( 454 Sq.ft. )16
16 Booked100% Booked
100% Booked
80 total apartments / 79 apartments booked. 98% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )80
79 Booked98% Booked
98% Booked
80 total apartments / 79 apartments booked. 98% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing Referred In Ii Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing Referred In Ii PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building C Wing Referred In Ii PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.51 Sq.mts. ( 436 Sq.ft. )81
74 Booked91% Booked
91% Booked
81 total apartments / 74 apartments booked. 91% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress55% done
55% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingJun 2021221111061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )80
78 Booked97% Booked
97% Booked
80 total apartments / 78 apartments booked. 97% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing Referred In Ii Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F Wing Referred In Ii PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building F Wing Referred In Ii PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G Wing Referred In 2Nd Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G Wing Referred In 2Nd PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building G Wing Referred In 2Nd PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shiv Shakti Builders And Developers
for Project
Tower 28
last updated on 13 Feb 2026 as per information obtained from MARA RERA.