Project overview
Trinity Oasis is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049405. Trinity Oasis is located at Naigaon East Road, Naigaon East, Naigaon East. This is a New Project being developed by Harsh Tirupati Developers Llp.
Trinity Oasis has 1 BHK Apartments with carpet areas ranging from 266 to 322 Sq.ft. Carpet. The Project has total 254 of which 164 are currently available for sale.
Trinity Oasis is being developed on a total land area of 37889 Sq.ft. Trinity Oasis has 3 Wings / Towers Regency Type - A,Trinity Tower Type-B,Trinity Tower Type-C
Project | Developer | Location | Possession |
-
Developer:
Harsh Tirupati Developers Llp
-
Phone:
-
Address:
-
402 4Th Floor, Sunrise Building, Waterfield Road, Opposite Ojas Eye Hospital, Bandra (West), Opposite National College, 400050
MAHA REARA No: |
P99000049405 |
Project Type |
Others |
RERA Project Status |
New Project |
Architect |
A M Faroz &Amp; Associates |
Funding Bank |
AXIS BANK LTD |
Proposed Possession |
30 Sep 2026 |
Revised Possession |
|
Extended Possession |
|
Litigations |
No Litigations |
Last Modified |
19 Feb 2024 |
Last Retrived |
13 Jan 2025 |
Trinity Oasis QR Code
Trinity Oasis
MahaRERA - P99000049405
Type | Area |
2 BHK | 58 Sq.mts. ( 624 Sq.ft. ) |
Office space | 70.28 Sq.mts. ( 756 Sq.ft. ) |
Shop | 15.25 Sq.mts. ( 164 Sq.ft. ) |
Shop | 15.64 Sq.mts. ( 168 Sq.ft. ) |
1 BHK | 29.96 Sq.mts. ( 322 Sq.ft. ) |
1 BHK | 24.68 Sq.mts. ( 266 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Trinity Oasislast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Only Meter Box Room |
|
|
Diesel Generator |
Fire Protection And Fire Safety
Requirements
|
|
As Per Fire Noc |
Landscaping & Tree Planting
|
|
Only Tree Planting |
|
|
As Per Building Plan |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
No Stp |
Solid Waste Management And Disposal
|
|
Na |
|
|
As Per Building Plan |
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Only Rain Water Harvesting |
|
|
Borewell &Amp; Pmc Water Connection After Completion |
Buildings / Wings in Trinity Oasis
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trinity Oasis by Harsh Tirupati Developers Llplast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
254
apartments in total
Saleable Area Statistics (Sq. ft.)
80587
Total
Total 254 apartments in project. 90 apartments booked. 35% apartments booked.
Total 80587 Sq.ft. saleable area. 28342 saleable area booked.
35% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Regency Type - A | Sep 2026 | 4 | 1 | 0 | 0 | 0 | 14 | 0 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 58 Sq.mts. ( 624 Sq.ft. ) | 2 | |
Office space | 70.28 Sq.mts. ( 756 Sq.ft. ) | 2 | |
Shop | 15.25 Sq.mts. ( 164 Sq.ft. ) | 1 | |
Shop | 15.64 Sq.mts. ( 168 Sq.ft. ) | 2 | |
7 total apartments / 0 apartments booked. 0% apartments booked. |
Work Description in Building Regency Type - A | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Trinity Tower Type-B | Sep 2026 | 21 | 1 | 0 | 1 | 1 | 197 | 187 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 29.96 Sq.mts. ( 322 Sq.ft. ) | 162 | |
162 total apartments / 65 apartments booked. 40% apartments booked. |
Work Description in Building Trinity Tower Type-B | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Trinity Tower Type-C | Sep 2026 | 22 | 1 | 0 | 1 | 0 | 114 | 35 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 24.68 Sq.mts. ( 266 Sq.ft. ) | 41 | |
1 BHK | 29.96 Sq.mts. ( 322 Sq.ft. ) | 44 | |
85 total apartments / 25 apartments booked. 29% apartments booked. |
Work Description in Building Trinity Tower Type-C | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Harsh Tirupati Developers Llp
for Project
Trinity Oasis
last updated on
13 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |