Project overview

Trinity Oasis is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049405. Trinity Oasis is located at Naigaon East Road, Naigaon East, Naigaon East. This is a New Project being developed by Harsh Tirupati Developers Llp.

Trinity Oasis has 1 BHK Apartments with carpet areas ranging from 266 to 322 Sq.ft. Carpet. The Project has total 254 of which 164 are currently available for sale.

Trinity Oasis is being developed on a total land area of 37889 Sq.ft. Trinity Oasis has 3 Wings / Towers Regency Type - A,Trinity Tower Type-B,Trinity Tower Type-C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Trinity Oasis
  • Location:
  • Naigaon East Road, Naigaon East, Naigaon East
  • Const. Stage:
    New Project
  • Possession:
    30 Sep 2026
Developer Details

  • Developer:
    Harsh Tirupati Developers Llp
  • Phone:
  • Address:
  • 402 4Th Floor, Sunrise Building, Waterfield Road, Opposite Ojas Eye Hospital, Bandra (West), Opposite National College, 400050
Project RERA Details
MAHA REARA No: P99000049405
Project Type Others
RERA Project Status New Project
Architect A M Faroz &Amp; Associates
Funding Bank AXIS BANK LTD
Proposed Possession 30 Sep 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 19 Feb 2024
Last Retrived 13 Jan 2025
Trinity Oasis QR Code
Trinity Oasis
MahaRERA - P99000049405
Apartment Details & Configuration
TypeArea
2 BHK58 Sq.mts. ( 624 Sq.ft. )
Office space70.28 Sq.mts. ( 756 Sq.ft. )
Shop15.25 Sq.mts. ( 164 Sq.ft. )
Shop15.64 Sq.mts. ( 168 Sq.ft. )
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )
1 BHK24.68 Sq.mts. ( 266 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Trinity Oasislast updated on 13 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Meter Box Room
Energy management
Diesel Generator
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
Only Tree Planting
Open Parking
As Per Building Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Building Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
Borewell &Amp; Pmc Water Connection After Completion
Buildings / Wings in Trinity Oasis
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trinity Oasis by Harsh Tirupati Developers Llplast updated on 13 Jan 2025 as per information obtained from MARA RERA.

37889 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

254 apartments in total
Total
254
Booked
90
Available
164

Saleable Area Statistics (Sq. ft.)

80587 Total
Total
80587
Booked
28342
Available
52245
Total 254 apartments in project. 90 apartments booked. 35% apartments booked.
Total 80587 Sq.ft. saleable area. 28342 saleable area booked.
35% area booked.

Regency Type - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Regency Type - ASep 202641000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58 Sq.mts. ( 624 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space70.28 Sq.mts. ( 756 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.25 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.64 Sq.mts. ( 168 Sq.ft. )2
None Booked0% Booked
0% Booked
7 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Regency Type - ACompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Trinity Tower Type-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity Tower Type-BSep 2026211011197187
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )162
65 Booked40% Booked
40% Booked
162 total apartments / 65 apartments booked. 40% apartments booked.
Work Description in Building Trinity Tower Type-BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress50% done
50% Booked
X number of Slabs of Super Structure

Trinity Tower Type-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity Tower Type-CSep 202622101011435
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.68 Sq.mts. ( 266 Sq.ft. )41
12 Booked29% Booked
29% Booked
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )44
13 Booked29% Booked
29% Booked
85 total apartments / 25 apartments booked. 29% apartments booked.
Work Description in Building Trinity Tower Type-CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Harsh Tirupati Developers Llp
for Project
Trinity Oasis
last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation