Project overview

Veena Serenity is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000016. Veena Serenity is located at Ejk9xw17dzy3calz7tlfng==. This is a Ongoing being developed by Veena Realcon Private Limited.

Veena Serenity has 2 BHK Apartments with carpet areas ranging from 572 to 572 Sq.ft. Carpet. The Project has total 288 of which 35 are currently available for sale.

Veena Serenity is being developed on a total land area of 33016 Sq.ft. Veena Serenity has 5 Wings / Towers Wing A,Wing B,Wing C,Wing D,Wing E

ProjectDeveloperLocationPossession
Natekar HeightsSabari Developers LlpPc/3V7jftameupeallypkeyl6hgx40x7wo++8Hqucbu=31-05-2019 00:00:00
Srushti Raj SiddhiChinnaiah Venkatesh Gowda+Cn72u1vdoqkbeqig0/+Ja==25-12-2022 00:00:00
Happy Home C WingEntee DevelopersBoi+B0jzzrpiumm8/Fnshg==31-12-2019 00:00:00
Mani BhavanChhadva AssociatesPzw/Uxasuygtlf75gypmxviywkuywbppqwdc0wyhplc=31-12-2019 00:00:00
Hubtown Seasons - B WingJoynest Premises PrivatelimitedTetwwqzaw20pldof5hsdjg==31-07-2025 00:00:00
Dhoot Adi Residency-Shree Adi House ChslDhoot Developers Pvt. Ltd.Qoyscymxtmivvlzdbbb/Eisbkzw+Hi338d5qqksvhue=31-12-2018 00:00:00
Shivsharda Chs LtdShivshankar Singh & OthersItskfmp1wyafgp10reyhwnhygl9ygkdgd4esmpb7p4u=31-12-2019 00:00:00
Sahakar Nagar 1 Shantivan Co-Op.Hsg. Soc. LtdApoorva PropertiesRfggzpealesc45km5ohkgg==31-12-2019 00:00:00
126 FlorencioArham EngineersTjlja0li/Xsvf4qyzxu2ua==31-03-2019 00:00:00
Tilak Indrayani Chs LtdReliance Corporation0Y+Rnj9oahomzrqslgnn2oipy1qk/Nadmzg68ntjt/Mxndhsxipgnt5lvluitxix30-09-2020 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedQa5y3u+5Nypbelry56eeba==31-07-2025 00:00:00
Gaodevi Krupa Darshan Sra Chs LtdShivshankar Singh & Others6E96cicsujen25d4barefyowrqogktxnwhljwipqdne=30-12-2024 00:00:00
Swiss BoulevardChaurang AssociatesRrpau4dgzh6owekpkfbagg==30-03-2022 00:00:00
Chembur Lokprabha Coop Hsg Soc LtdOm Sai EnterprisesZmzo4/Olxhkfng/Qckm7om+Nixfm2pclkqmfgcxfby8=30-12-2019 00:00:00
Chembur Jeevan Deep Coop Hsg Soc LtdOm Sai Enterprises400089, Mumbai Suburban30-09-2018 00:00:00
Premiere By PanachePanache Developers Pvt Ltd.Vjx5zehdnc29zqwi504d8yxmmguinru9xcvtwqayvus=30-12-2023 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private LimitedGpx0lhr4qlmpgjgwql0m0q==30-12-2022 00:00:00
Srushtiraj TowerChinnaiah Venkatesh Gowda6Kzg/Klichrfeboqp8ouhq==22-12-2022 00:00:00
Veena SerenityVeena Realcon Private LimitedEjk9xw17dzy3calz7tlfng==01-12-2021 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseJj5m3fjvfleziuvzreua4a==31-12-2018 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedGcousc0glzn6cm5b75lozm89c4w1dbjl2kpyymejavyaikbm4ny4vh5x5h8pbq41rv78bajewwgxysl9d8buhml7iathkxmf9mt+Sht/+5Wfef0sgjyngrrmlvmhwl7xp7nuguugcl1ap052j2ky1q==30-04-2022 00:00:00
Tilak Nagar Shree Sainath Chs LtdSankalp DevelopersMumbai Suburban, 40008931-07-2018 00:00:00
Shivdarshan Sra Chs LtdShree Swami Samarth BuildersLb8gdgrbgwrtmlxzoadm38co7ci/Xwgf97gsullk8pyrnu4nex41+Su6awk0njqdys9mj9tfvyeui7cpyv9dtiapjwr068n/Gz+Mpbxyw10=31-12-2018 00:00:00
Mass MetropolisGrace Urban Development CorporationAexiqmg5mxikq+R+Cxxqprmi7z1ytgkatmwnzlqyhjo=30-12-2024 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And DevelopersSov9rzzyqhewyozpg2ddpg==31-12-2018 00:00:00
Prem BelaireM/S Aryan InfraAikrpnujx2nnwxtdsnvn6g==02-02-2019 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedT8q/Uadv211acvoflbmtc80g+Mezmrsdtuqo/Twmbaotvltikhphn+D4zbtwud0svkynhuak6neelwh0wvac6raxu5usuv1obojiqfnj3jbzcd2/Lrjskghrsqycmcv5q/Pchvlg05otzf7dh7zglq==30-04-2018 00:00:00
Tulsi ElanzaMetro Capital/Toruenmclmfedoq90epygkg/Hgpwgjlvyz5vsfxebk=31-12-2019 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private LimitedC4ldm0vdykcmgt7tjowkkybex/Zailfujjraudc+Yeaebraiwiyd1s+Vm5mjilabfmknljibfrd4lqt8sxsiuq==30-12-2021 00:00:00
Ekta ResidencyAshok Hazarimal Tharwani2Ufvytnkib8b8ovo0/9Gjjtb4vl6untcciqlsuwtbzn9scftni0g70u4ghwxircndu8l0minai3ylog/Zieembnk7mbnvme3vu1fybv6pzu=31-12-2019 00:00:00
GulmohurSanjay Jumani4Ukfrjgwl7lhgojz6blgkq==31-07-2019 00:00:00
Srushti ViharChinnaiah GowdaMumbai Suburban, 40008901-11-2022 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private Limited0Tiqwlacztorg6g+Gc6tng==30-12-2024 00:00:00
Ruparel OrionK D Lite Developers Pvt Ltd5Zr6ttbemhrkifggvc9v2g==30-12-2021 00:00:00
Amber EmpireAmber Capro Private LimitedLwic8d9gxiqecfir5z5xjq==31-03-2019 00:00:00
Dev DarshanCity Estate Developers Limited73Dtqyebhcvk0nmfmhhgbilsecokj8fr83k2okzvuhposajd1hzspprwlf6hjny130-12-2022 00:00:00
VastukalpNhk Developers Llp0Nvibmjbjrrjrec+Xsfbfwvvss/6Kroky8vruy1ff6j/Ytgh4spdig0iefaynkw330-12-2025 00:00:00
Moulick EnclaveSrushti Sangam Developers Pvt LtdGpzni1tqn1ciibhg4mmx8q==01-09-2023 00:00:00
Midas-Bhakti MeadowsIrene Edwyn DmelloXztveg5/Cvn8ah0opene0w==30-06-2019 00:00:00
Kalpana SangamSrushti Sangam Builders Pvt Ltd400089, Mumbai Suburban01-09-2022 00:00:00
Silicon EnclaveShilpriya Builders And DevelopersWjp88ir5gracikouq6kjiq==31-12-2019 00:00:00
Saffron Residency Phase -1Ayodhya Construction CoS6d+Rgxu1kpapk83lvrkxa==30-12-2022 00:00:00
Sai PradnyaDrushti Realtors5+V4zvyi9qkukoblmbl+Wnazg8e77rqxsobtrgxttte=30-06-2018 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And DevelopersSov9rzzyqhewyozpg2ddpg==31-12-2019 00:00:00
F. Residences Ghatkopar- Wing A And BArihant RealtorsGj3li/Fo6h4zkfngkm/Oxw==31-07-2019 00:00:00
Signature Business ParkSwastik DevelopersFrsavk8yn8sgocusfooikrwxjr1zde7i4/Yjmi7atf0=30-12-2022 00:00:00
Laxmina Krishna NiwasLaxmina Argentum Realties (India) Private LimitedF3oah+Gxze5mkriduwcooquhdbj1jslaexbbjh+Fqks=31-03-2026 00:00:00
Sai ShrushtiShree Sai RealtorsAvpvnt/Xsfc04pykdgha2v5e/+Tdsdt+5Hfnawdwqfk1zcz0dglakahoec3uwxnkckstd+Hlrrjqr+Qnhd6eug==30-12-2027 00:00:00
39 AntheaShreenathji Developers Pvt. Ltd,Mumflmqs/Unlyvvexvxdpw==31-03-2020 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate LlpOmu2lerjdxkqensx95jabq==31-12-2018 00:00:00
Tridhaatu Atharva Venkatesh SadanTridhaatu Venkatesh Sadan Developers LlpV N Purav Marg31-01-2019 00:00:00
Sai SansarConcrete Builders+Ac3mrandz6l8w3atqqkywfoid5gykwasgadthgwliw=30-12-2023 00:00:00
Bhandup Citizen Chs LtdCastle Floors Pms Pvt LtdMumbai Suburban, 40007830-06-2021 00:00:00
Vaibhav Chowk Sra Chs LtdSunil Mohan JoshiKv9tsxvpbk9pckirfwl5biyl7cpszapcs3yxiiebrlq=30-12-2022 00:00:00
Abhilash Phase IiSanjona BuildersHssy0xv7wxx3sxitfqlpm9ijkgxmfkd/1Mihxcggqqj49/Zdmffuitqbtazryvr731-12-2024 00:00:00
Gagan 138Gagangiri Construction8Amibuqvjcfiasbnpzso6esleenlolv78nhujnmcc9pbqcntixvuxgkyd/7Xpj8q31-12-2025 00:00:00
EkdantaEkdanta Constructions And DevelopersEkxq7iuy4z5csc+Es59bew==31-12-2025 00:00:00
Sabari GayathriSabari Developers LlpK4tn7fzvsckwkc92iixfb3u8xjyruz27xnljy13llas=30-09-2024 00:00:00
Puneet KalpavrikshaPuneet Prateeksha Spaces9Exe1mirjwlhu36l5w657aqkdj15tru0jibhpjw1470=30-06-2025 00:00:00
Raghav NovaVaidehi Construction & DevelopersL96ljtginrelqgw/Cfmbla==31-07-2023 00:00:00
Raghav OneRaghav Raj Builders & Developers LlpZ50sfylydxrq4ntvknujdq==30-06-2021 00:00:00
Ruparel PrimeroShree Siddhivinayak Classic Construction Private LimitedUdpf/Hy7iqbeveb+Hxoyjq==30-12-2024 00:00:00
Raghav One45Raghav Raj Builders & Developers LlpZ50sfylydxrq4ntvknujdq==28-02-2023 00:00:00
Amesh Chs LtdRight Channel Construction Pvt LtdMumbai Suburban, 40007130-06-2018 00:00:00
Shreenath DarshanShreenath Buildgrand Private LimitedMumbai Suburban, 40007831-12-2016 00:00:00
Shankar Bhavan Premises Co-Operative Society LimitedMishal Construction Private Limited40007131-12-2019 00:00:00
Thapar Le ParcSamarpeet Properties Pvt LtdPzyqglpvtwyay2pyrx33fcpfosobvhlscq2lg1jvakg=30-06-2026 00:00:00
Mohite MrugankMohite Infraprojects Private LimitedVzmveexmtmwz4ol1vnwgbg==30-09-2026 00:00:00
Arham MouryaMahavir Millennium LlpTctxrs+3Z3fumuceticbyw==31-12-2026 00:00:00
Hareshwar PrideSatyadeep Realtors Pvt. Ltd.Flijqinbvt+U12h0qhkcag==31-12-2025 00:00:00
Orient Regency Building No. 1Orient CombineQyajbbyofdc2m51cr16+E4mb6/V5zsfaszqvbuekqitg59zerw7kozmsweycinuc14-12-2026 00:00:00
Apoorva RiseApoorva HousingAeehw+5Qeooiztlwaknmqw==31-12-2024 00:00:00
Swastik EleganceSwastik RealtorsS7f++Qsvgwppmjrwuf5qyq==31-12-2023 00:00:00
Nehru Nagar Shiv Vaibhav Chs Ltd Bldg No 38Parsn Construction And Developers Private LimitedXpev1sxncwwhsfsu5glzx1hmceljld3buxvc2fa8hc8uvnfd6vdat7ongaez10cf31-12-2025 00:00:00
Silicon Hofe B WingShilpriya Builders And DevelopersPgicke/Zxzkcql1vh/Gr62zhmfsk3m+Bdxzobsbf+Y4=31-07-2026 00:00:00
ElysiumKripa Elite Homes81Bivcg88aqgql5b2ucwswflu/3Ymkazthbgvnoensmgift0w6q3ud0/Ggcufekqnmrg2ut2xcepvgvwqcykasleawkdpsrnbreho4hitx95x5neopoaeifgxpofmuuzuvbov4apaqonma4fi8sr6w==31-12-2027 00:00:00
Kedarnath ApartmentsMajestic Royale Developers3Liw5nkrmnwf6qblwgulka==31-12-2027 00:00:00
Vivan HeightsSubhash Chandanmal JainFxk4n7k/Gf4y3t6v/Ykxpw==31-12-2027 00:00:00
Atharva VaibhavAtharva DevelopersXk5kfbwxt/Tlnxyurxxsgmzfqq+Jeflxaxdsksxx90au9ueftgvcwluhswoqsvib31-12-2028 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedSxvpnedu1/+Aa7z/Xwi+4W+Duvyas1o2aanademdj4e=30-03-2021 00:00:00
Shweta ChsAtharva DevelopersVdnchtq6xhkuwfrgxwgxp6ryc+Z7mmzw4gfpq6ya5kp/27L4up54b3q1kvwj0ubcjjuef7i9kocgatg8ewvg4whxgqombtykkhqtw/Ao7gq=31-12-2018 00:00:00
Redevelopment Of Tilak Nagar Nisarg Co. Op. Hsg. Soc. Ltd.M/S. Reliance Realtors & Estate DevelopersFccyqttltvx7atebli9imn1uhiemctwpqjqffey0sxaqlo3cwkthpg/Dknhvkzu5hq3g1e5cmcktnctkhxrtbsjamq6fyguy54tul4gierm=30-12-2020 00:00:00
Shree DeeplaxamiPuro ConstructionsKi8jaiqnae2zxzxlgy8qyjctigemqtguhxsku5cuwyqcgmslzuy2zep4i+C/7Rpy31-12-2019 00:00:00
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private LimitedVn+Xhiyw1mgqlzh24kwqxvjzbtw/894As3gwekdtrnk=31-12-2018 00:00:00
49 ElinaHuges Real Estates Developers LlpQhvxhpehrue1iivkeqlutw==31-12-2019 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth DevelopersFmhjd1nt+Juiwangz6ct12qbuels/Lnrtynhzk6n0n40wdioe4mioxgcf6f4gco6n4syoff0effzmoz/M/Ahwq==31-12-2018 00:00:00
Skyline Sparkle Wing C Skyline GreathillsXnftz+Yn86jpwao3/A016a==31-12-2019 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles & Developers Pvt. Ltd.EUsfldjhkalsk0d4pi7d/3Mj3/8Kp5/D61rizrcq5mbq=31-05-2019 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
Raghav VistaRaghav Raj Builders & Developers Llp0Couvovyipixvw97o/+8Xq==31-12-2028 00:00:00
Bhakti PrideBhakti HomesH6n8kt/Cjijnqr76nm2jzq==31-12-2027 00:00:00
NarullaMajestic Royale Developers02Fscijbtumlbrsf9tu+Q1jyawjp39kx4bargb/Celg=30-06-2028 00:00:00
Sidhivinayak AuraMgs Property Developers Pvt. Ltd.Knbvmyxxgvrkco0mqhltkzuhla2jbt5uuylg81fxrua=31-12-2027 00:00:00
CelestialSu Sharda Edifice LlpK9vkfxdee7fvzeschlufjsujaev2fre2csab10vkbbo=30-12-2024 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road31-10-2018 00:00:00
Aayush PoornimaAayush DevelopersMhcm+Owa6eylyx5cg+Jmbw==30-06-2019 00:00:00
Zen ApartmentsBholenath Developers Ltd.Nzxtdvfml8pypw+Oy6vvhrvgvd0hi9md/A8mfo5t+Mjxjy9hxlretck96cqvlgpj31-03-2018 00:00:00
Hubtown Seasons - I WingJoynest Premises Private Limited7Smanefmwmrweiqb3xbx9q==30-12-2025 00:00:00
NakshatraMetro Developers Co.Geqkprg5kaadslhbjy+Jfa==30-03-2022 00:00:00
Shankar Darshan Chs LtdMajestic Royale DevelopersHsywqnpa1t2q4lafevjm6a==31-12-2026 00:00:00
Janki HeritageHeritage Lifestyles & Developers Pvt. Ltd.Y6xrakxf+Tlgsvjhs7pn+O93l3t4bhx2nnpsmvw2yb7/5Gild9x7mnnrfz0cd1bv31-12-2024 00:00:00
Gadkari ParadiseGadkari Builders & AssociatesJw+Maqrl4oynbarrcntpmq==31-12-2019 00:00:00
Aayush GokulAayush DevelopersDb36ebtf5iky6hetcprkfg==30-06-2027 00:00:00
25 Downtown-Wing 4-Ruby MountTwenty Five Downtown Realty Limited31-12-2035 00:00:00
ShubhElite Lifespaces31-05-2029 00:00:00
71 PardisPardis Construction Llp31-12-2027 00:00:00
Pardis ShivanshPardis Shivansh Llp31-12-2028 00:00:00
JadePriya Constructions/X5sfnxb6fagklik8olrcbwpvjoajvaoq9o3v4oyfcm=30-06-2024 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private Limited0Tiqwlacztorg6g+Gc6tng==30-12-2024 00:00:00
Neptune FlorenciaSachin M Deshmukh And Nayan A Bheda (Aop)Mumbai Suburban31-12-2018 00:00:00
Marvel Gold - Phase Ii - ColloseumSwaroop Constructions Private LimitedMumbai Suburban30-12-2022 00:00:00
Sidheshwar RoyaleM/S Yug DevelopersWndv139exldjrxhwzs4awg==31-03-2026 00:00:00
Shivam YashodhaShivam Lifestyle31-07-2028 00:00:00
Aayush AurumAayush Builders & Developers Llp01-09-2028 00:00:00
Swastik RevantaSwastik Realtors31-12-2028 00:00:00
Raghav OrchidRaghav Raj Builders & Developers Llp31-12-2030 00:00:00
Anand TowerArihant AssociatesMumbai Suburban, 40008931-12-2017 00:00:00
AtharvaMaya DevelopersMrpqqm1mqmpbhmmaqyilww==30-09-2020 00:00:00
Sunshine OakwoodSunshine Housing Private LimitedFmkp9kirpckyapt5ilxgkw==30-03-2024 00:00:00
Sai Ashish IiKukreja Construction Co3Yvp8wmam59zo/T19jn6vlblw/Q2f+O4sz4djzktstosnbcoezouwtedssq2oh8s31-12-2017 00:00:00
Shree Parshwanath Sra Chs LtdChintamani Realtors40007830-12-2021 00:00:00
Trishabh MirayaMetro Properties31-12-2028 00:00:00
Superb AlturaBrihan Mumbai Sahakari Cinema Theatres Chembur Maryadit31-12-2030 00:00:00
Sayba SwarnaK D Constructions31-12-2027 00:00:00
Devi Kakad SolitaireNiraj Kakad Constructions40007128-02-2018 00:00:00
Arya HeightsRishabh EnterprisesAsyy2oiirnu9nfe6a0ng8bqdapnzmlts+Mth3jaog3g=30-12-2021 00:00:00
Tirupati HeightTirupati DeveloperMskcii+Fcglk8rgyvl0z7a==31-08-2018 00:00:00
Business PointPoint Developers Pvt. LtdA1ibgxmnbl9e62ntwt9awa==31-12-2019 00:00:00
Jay KrishnaShreegoandevi Enterprises Private Limited0Yvr/13Lnbvahkmgcwbicwvkkcoprusmz2khrkeinkzbzmfyfycc/Vcsz50egamv30-12-2023 00:00:00
M M SpectraM. M. Developers - ShramjiviRdhxfap5y/Tcirnqcira4g==31-10-2018 00:00:00
Srinivas BuildingArjun Development & Construction ( India ) Private LimitedBhj7/Xjf5exxaix7wqcrdg==31-12-2019 00:00:00
Shraddha InfinityShraddha Landmark Private LimitedPbuya1qtio8iaybnpdsg2w==31-12-2018 00:00:00
ShivblissRushi Builder & DeveloperHh39qocjawn2gbsty+Ihhq==31-12-2018 00:00:00
Project Details
  • Project:
    Veena Serenity
  • Location:
  • Ejk9xw17dzy3calz7tlfng==
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2021
Developer Details

  • Developer:
    Veena Realcon Private Limited
  • Phone:
  • Address:
  • Veena Sarang Complex
Project RERA Details
MAHA REARA No: P51800000016
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jitendra G Dewoolkar
Funding Bank RBL Bank Limited
Proposed Possession 01 Dec 2021
Revised Possession 01 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 05 Jun 2017
Last Retrived 26 Jul 2025
Veena Serenity QR Code
Veena Serenity
MahaRERA - P51800000016
Apartment Details & Configuration
TypeArea
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )
1 BHK39.83 Sq.mts. ( 429 Sq.ft. )
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )
2 BHK58.63 Sq.mts. ( 631 Sq.ft. )
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )
2 BHK53.11 Sq.mts. ( 572 Sq.ft. )
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Veena Serenitylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
By Developer
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
By Developer
Landscaping & Tree Planting
By Developer
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)35% completed
35% Complete
By Developer
Solid Waste Management And Disposal
By Developer
Storm Water Drains45% completed
45% Complete
By Bmc
Street Lighting25% completed
25% Complete
By Bmc
Treatment And Disposal Of Sewage And Sullage Water
By Developer
Water Conservation, Rain water Harvesting
By Developer
Water Supply50% completed
50% Complete
By Bmc
Buildings / Wings in Veena Serenity
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Veena Serenity by Veena Realcon Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

33016 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

288 apartments in total
Total
288
Booked
253
Available
35

Saleable Area Statistics (Sq. ft.)

169514 Total
Total
169514
Booked
145340
Available
24174
Total 288 apartments in project. 253 apartments booked. 87% apartments booked.
Total 169514 Sq.ft. saleable area. 145340 saleable area booked.
86% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJan 2020161100066
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )42
36 Booked85% Booked
85% Booked
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )14
9 Booked64% Booked
64% Booked
56 total apartments / 45 apartments booked. 80% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress75% done
75% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJan 2020161100029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.83 Sq.mts. ( 429 Sq.ft. )43
43 Booked100% Booked
100% Booked
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )15
14 Booked93% Booked
93% Booked
58 total apartments / 57 apartments booked. 98% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJan 1900161100057
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.63 Sq.mts. ( 631 Sq.ft. )15
10 Booked66% Booked
66% Booked
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )27
21 Booked77% Booked
77% Booked
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )14
4 Booked28% Booked
28% Booked
56 total apartments / 35 apartments booked. 62% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress35% done
35% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress35% done
35% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress35% done
35% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJan 2020161100032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK53.11 Sq.mts. ( 572 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )30
30 Booked100% Booked
100% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJan 2020161100028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )30
30 Booked100% Booked
100% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Veena Realcon Private Limited
for Project
Veena Serenity
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation