Project overview

Vijay Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700008755. Vijay Enclave is located at Waghbil Road, Village Kavesar, Ghodbunder Road, Village Kavesar, Ghodbunder Road. This is a On-Going Project being developed by Vijay Citispace Pvt. Ltd..

Vijay Enclave has 2 BHK Apartments with carpet areas ranging from 673 to 750 Sq.ft. Carpet. The Project has total 376 of which 296 are currently available for sale.

Vijay Enclave is being developed on a total land area of 14367 Sq.ft. out of which 23182 Sq.ft. i.e 161% is reserved for recreational purposes. Vijay Enclave has 4 Wings / Towers Building No 4 Floor 1 To 30,Building No 4 Floor 31 To 40,Building No 5 Floor 1 To 30,Building No 5 Floor 31 To 40

ProjectDeveloperLocationPossession
Jangid Galaxy Tower 3Jangid ContructionsThane, 40060730-09-2018 00:00:00
Cosmos ClassiqueConcorde BuildersPatlipada, Patlipada31-12-2016 00:00:00
Hill SpringAsha InfratechSurvey No 69/1 (P), Bhadvad, Bhadvad31-12-2022 00:00:00
One Park Avenue - Avenue 6Purva Oak Private LimitedGhodbunder Road, Thane, Thane31-12-2021 00:00:00
AthenaRoma Builders Private LimitedOff Ghodbunder Road, Hiranandani Estate, Hiranandani Estate30-12-2022 00:00:00
BarcaRoma Builders Private LimitedOff Ghodbunder Road, Hiranandani Estate, Hiranandani Estate30-12-2022 00:00:00
Surendra VillaShivkrupa Construction And Developers Pvt LtdVillage Kavesar Thane, Opp. Vijay Residency, Opp. Vijay Residency15-07-2021 00:00:00
Bhoomi Acres M WingV R Constructors Private LimitedWaghbil Road, Thane, Thane30-12-2021 00:00:00
ChestertonRoma Builders Private LimitedWood Street, Patlipada, Hiranandani Estate, Off Ghodbunder Road, Patlipada, Hiranandani Estate, Off Ghodbunder Road30-03-2023 00:00:00
GlenwoodRoma Builders Private LimitedWood Street, Patlipada, Hiranandani Estate, Off. G B Road, Patlipada, Hiranandani Estate, Off. G B Road30-12-2025 00:00:00
Jangid Galaxy Tower 2Jangid ContructionsThane, 40060730-04-2019 00:00:00
Pataskar Eclat Building No 3Pataskar Developers Pvt. LtdGhodbunder Road, Kavesar, Kavesar31-12-2017 00:00:00
Platinum HeritageDarshan Sagar DevelopersHiranandani Estate, Patlipada, Patlipada31-12-2017 00:00:00
ElcantoDedhia Builders And Developers (India) LlpThane, 40061531-12-2017 00:00:00
PearlSagar EnterpriseVijay Garden Road, Nr Shree Satguru Garden, Nr Shree Satguru Garden31-08-2019 00:00:00
ZeniaRoma Builders Private LimitedGhodbunder Road, Hiranandani Estate, Hiranandani Estate31-12-2018 00:00:00
Vijay EnclaveVijay Citispace Pvt. Ltd.Waghbil Road, Village Kavesar, Ghodbunder Road, Village Kavesar, Ghodbunder Road31-03-2024 00:00:00
Jangid Galaxy Tower 7Jangid ContructionsThane, 40060730-12-2022 00:00:00
Hill Spring Phase 1VelocityLbs Marg, Thane West, Thane West31-03-2016 00:00:00
Cosmos JewelsCosmos LifestyleThane, 40061531-12-2017 00:00:00
Rosa Oasis Phase 3Uma EnterprisesThane, 40061531-03-2017 00:00:00
Unique Green - MhadaMadhu DoshiThane, 40060731-12-2017 00:00:00
Falcon Building No 58Roma Builders Private LimitedCentral Avenue, Hiranandani Estate, Hiranandani Estate30-04-2028 00:00:00
Silver Oak At Prestige ResidencyPrescon Realtors &Amp; Infrastructures Pvt. Ltd.Ghodbunder Road, Kavesar, Kavesar31-12-2018 00:00:00
Garden Court Type B2Deeaardee EnterprisesWaghbil, Vasant Leela, Vasant Leela31-12-2019 00:00:00
Project Details
  • Project:
    Vijay Enclave
  • Location:
  • Waghbil Road, Village Kavesar, Ghodbunder Road, Village Kavesar, Ghodbunder Road
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Mar 2024
Developer Details

  • Developer:
    Vijay Citispace Pvt. Ltd.
  • Phone:
  • Address:
  • 205,, Marine Chambers,, 43, New Marine Lines, Opp. Sndt College, Churchgate, 400020
Project RERA Details
MAHA REARA No: P51700008755
Project Type Residential
RERA Project Status On-Going Project
Architect Sanjay Puri Architects
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2024
Revised Possession 30 Mar 2025
Extended Possession
Litigations Yes
Last Modified 10 Mar 2022
Last Retrived 16 Jan 2025
Vijay Enclave QR Code
Vijay Enclave
MahaRERA - P51700008755
Apartment Details & Configuration
TypeArea
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vijay Enclavelast updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Rg Development As Per Thane Municipal Corp. Plan
Common amenities like Gym Common room games room reading room senior citizen party room
At 1St Floor Amenity Area Common For Both Bldgs
Community Buildings15% completed
15% Complete
Clubhouse Is Proposed And Common For Layout
Electrical Meter Room, Sub-Station, Receiving Station
Common For Layout
Energy management
Common For Both The Buildings
Fire Protection And Fire Safety Requirements
Common For Both The Bldgs As Per Cfo Noc
Landscaping & Tree Planting62% completed
62% Complete
Refurbishment To Be Done For Part Area
Open Parking
Not Yet Commenced
Sewerage (Chamber, Lines, Septic Tank , STP)
Common Stp To Be Given For Both Buildings
Small area and childproof room with soft rubber flooring upto age of 5 years
At 1St Floor Amenity Area Common For Both Bldgs
Society office
As Per Approved Plan
Solid Waste Management And Disposal
Organic Waste Converter Shall Be Provided
Storm Water Drains
To Be Provided As Approved By Muni. Corporation
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Shall Be Used For Toilet Flushing And Gardening
Water Conservation, Rain water Harvesting
Common For Both The Buildings
Water Supply
To Be Given By Municipal Corporation After Oc
Wooden flooring for yoga OR meditation room and open space for gathering
At 1St Floor Amenity Area Common For Both Bldgs
Buildings / Wings in Vijay Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vijay Enclave by Vijay Citispace Pvt. Ltd.last updated on 16 Jan 2025 as per information obtained from MARA RERA.

14367 Sq. ft.

Project Area

23182 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

376 apartments in total
Total
376
Booked
80
Available
296

Saleable Area Statistics (Sq. ft.)

199276 Total
Total
199276
Booked
42936
Available
156340
Total 376 apartments in project. 80 apartments booked. 21% apartments booked.
Total 199276 Sq.ft. saleable area. 42936 saleable area booked.
22% area booked.

Building No 4 Floor 1 To 30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4 Floor 1 To 30Mar 202431121167109
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )58
14 Booked24% Booked
24% Booked
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )58
16 Booked27% Booked
27% Booked
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )53
19 Booked35% Booked
35% Booked
169 total apartments / 49 apartments booked. 28% apartments booked.
Work Description in Building Building No 4 Floor 1 To 30Completion
Excavation
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress30% done
30% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 4 Floor 31 To 40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4 Floor 31 To 40Jan 1900100000063
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK37.8 Sq.mts. ( 407 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK40.36 Sq.mts. ( 434 Sq.ft. )18
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 4 Floor 31 To 40Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 5 Floor 1 To 30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5 Floor 1 To 30Mar 202431121113107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )53
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )58
24 Booked41% Booked
41% Booked
111 total apartments / 31 apartments booked. 27% apartments booked.
Work Description in Building Building No 5 Floor 1 To 30Completion
Excavation
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 5 Floor 31 To 40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5 Floor 31 To 40Jan 1900100000042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.51 Sq.mts. ( 673 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK69.69 Sq.mts. ( 750 Sq.ft. )20
None Booked0% Booked
0% Booked
38 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 5 Floor 31 To 40Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vijay Citispace Pvt. Ltd.
for Project
Vijay Enclave
last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation