Aaradhya One Earth Project at Ghatkopar East by MICL (P51800024676) a Sold Out Project with 2 BHK apartments / Flats starting from ₹ 2.6 Crs onwards

Aaradhya One Earth is a Residential Project by MICL. Located in the prestigious neighbourhood of Ghatkopar East, with easy connectivity to major express ways like Eastern Express Highway, roads and public transport. Luxurious 4 BHK and 3 BHK flats, Spacious apartments with Vaastu-compliant design and premium finishes. A range of amenities, including a gym, swimming pool, and rooftop garden, club house and many more. Ready possession.
Aaradhya One Earth QR Code
Aaradhya One Earth
MahaRERA - P51800024676

The Views

₹ 2.34 Crs. onwards
Ghatkopar East
2/2½ BHK apartments
View Details

77 Crossroads - Nova

₹ 83.72 Lacs. onwards
Ghatkopar East
2 BHK apartments
View Details

The X

₹ 2.24 Crs. onwards
Ghatkopar East
2/3/4 BHK apartments
View Details

Dotom Jewel

₹ 2.85 Crs. onwards
Ghatkopar East
2/3/4/5 BHK apartments
View Details

Ruparel Pristine

₹ 1.25 Crs. onwards
Ghatkopar East
1 BHK apartments
View Details

Swaroop Residency

₹ 1.07 Crs. onwards
Ghatkopar East
1/2 BHK apartments
View Details

Skyline Magnus

₹ 3.95 Crs. onwards
Ghatkopar East
3 BHK apartments
View Details

Aaradhya One Park

₹ 2.73 Crs. onwards
Ghatkopar East
2/3/4/5 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Aaradhya One Earth
  • Location:
  • Ghatkopar East, Ghatkopar Avenue, Off Eastern Express Highway
  • Const. Stage:
    Sold Out
  • Possession:
Developer Details

  • Developer:
    MICL
  • Phone:
    022 42463999
  • Website:
    www.miclgroup.in
  • Address:
  • Man Infraconstruction Ltd. 12th Floor, Krushal Commercial Complex, Above Shoppers Stop, G M Road, Chembur (West), Mumbai 400 089, India
Project Ratings
Project Brochures
Brochures of Aaradhya One Earthby MICL
Project Brochures
  • MPE/Brochures/29187/Aaradhya One Earth Brochure.pdf
  • MPE/Brochures/29187/Floor Plan.pdf
Project Amenities
Amenities offred in Aaradhya One Earth
LIFESTYLE AMENITIES
Power BackupOutdoor GamesLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 30 Mar 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800024676
RERA Project Name Ghatkopar Avenue Aaradhya One Earth Phase I
RERA Location S No 236 A Part And Cts No 194 A
RERA Developer Man Realtors And Holdings Private Limited
Project RERA Details
Project Type Others
Funding Bank ICICI BANK LIMITED
Last Modified 19 Oct 2020
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Ghatkopar East

Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya One Earthlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Wip/No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
Wip
Landscaping & Tree Planting70% completed
70% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal80% completed
80% Complete
Wip
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water80% completed
80% Complete
Wip
Water Conservation, Rain water Harvesting80% completed
80% Complete
Wip
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Aaradhya One Earth
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya One Earthby MICLlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

36221 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

632 apartments in total
Total
632
Booked
632
Available
0

Saleable Area Statistics (Sq. ft.)

366929 Total
Total
366929
Booked
366929
Available
0
Total 632 apartments in project. 632 apartments booked. 100% apartments booked.
Total 34088.58 saleable area. 34088.58 apartments booked.
100% area booked.

Rehab Tower 1 - Alpha

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Tower 1 - AlphaMar 2024181310028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK47.47 Sq.mts. ( 511 Sq.ft. )115
115 Booked100% Booked
100% Booked
115 total apartments / 115 apartments booked. 100% apartments booked.
Work Description in Building Rehab Tower 1 - AlphaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Tower 2 - Breeze

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Tower 2 - BreezeMar 2024181310029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK47.47 Sq.mts. ( 511 Sq.ft. )116
116 Booked100% Booked
100% Booked
116 total apartments / 116 apartments booked. 100% apartments booked.
Work Description in Building Rehab Tower 2 - BreezeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Tower 3 - Coral

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Tower 3 - CoralMar 2024181310017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK47.47 Sq.mts. ( 511 Sq.ft. )66
66 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Rehab Tower 3 - CoralCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Tower 4 - Delta

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Tower 4 - DeltaMar 2024181310025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK47.47 Sq.mts. ( 511 Sq.ft. )100
100 Booked100% Booked
100% Booked
100 total apartments / 100 apartments booked. 100% apartments booked.
Work Description in Building Rehab Tower 4 - DeltaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Tower 5 - Eve

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Tower 5 - EveMar 2024181310013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK47.47 Sq.mts. ( 511 Sq.ft. )51
51 Booked100% Booked
100% Booked
51 total apartments / 51 apartments booked. 100% apartments booked.
Work Description in Building Rehab Tower 5 - EveCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower A - Avion

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower A - AvionMar 2024171310090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.43 Sq.mts. ( 715 Sq.ft. )44
44 Booked100% Booked
100% Booked
2 BHKwithbalcony66.43 Sq.mts. ( 715 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKwithbalcony67.08 Sq.mts. ( 722 Sq.ft. )30
30 Booked100% Booked
100% Booked
3 BHK92.9 Sq.mts. ( 1000 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK101.91 Sq.mts. ( 1097 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23 Sq.mts. ( 248 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25 Sq.mts. ( 269 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop40 Sq.mts. ( 431 Sq.ft. )1
1 Booked100% Booked
100% Booked
92 total apartments / 92 apartments booked. 100% apartments booked.
Work Description in Building Tower A - AvionCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower C - Casa

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower C - CasaMar 2024171310047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.43 Sq.mts. ( 715 Sq.ft. )31
31 Booked100% Booked
100% Booked
2 BHK WITH BALCONY75.07 Sq.mts. ( 808 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK WITH BALCONY92.9 Sq.mts. ( 1000 Sq.ft. )15
15 Booked100% Booked
100% Booked
47 total apartments / 47 apartments booked. 100% apartments booked.
Work Description in Building Tower C - CasaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D - Dew

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower D - DewMar 2024171310045
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.34 Sq.mts. ( 488 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK61.78 Sq.mts. ( 665 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK WITH BALCONY66.15 Sq.mts. ( 712 Sq.ft. )30
30 Booked100% Booked
100% Booked
45 total apartments / 45 apartments booked. 100% apartments booked.
Work Description in Building Tower D - DewCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
MICL
for Project
Ghatkopar Avenue Aaradhya One Earth Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About MICL

Man Infraconstruction is a leading construction company in India that has executed construction work for some of the most significant port projects in the country. We continue to alter the structural landscape through several other prestigious projects in the residential, commercial, Institutional and industrial space as well. Our commitment to excellence in quality was personified through India's first premier private port project for Nhava Sheva International Container Terminal at Jawaharlal Nehru Port Terminal, Navi Mumbai in 1997. Subsequently, we have successfully worked on five ports viz., Jawaharlal Nehru Port Trust, Mundra Port, Chennai Port, Vallarpadam Port and the Pipavav Port. Man Infra has successfully executed construction of high rise building with 3 Residential Towers of 55 storey which is one of the tallest towers’ in western suburb of Mumbai. We have relentlessly explored and seized construction opportunities across various business verticals. As a natural extension and in line with the aspiration to climb up the value chain, Man Infra (The Group) has entered into Real Estate Development. The Group is currently developing premium Residential Projects with an approximate saleable area of 5 million sq. ft. in various suburbs of Mumbai. We aspire to be one of the top builders in Mumbai.