Project overview
Bandra North Project at Bandra East by Shivalik Ventures Private Limited (P51800014036) is a RERA approved Under Construction Project with RERA ID P51800014036 slated to be ready for possession by Dec 2025 with 1/2 BHK apartments / Flats starting from ₹ 1.09 Crs onwards

Bandra North is a Residential Project Developed by Shivalik Ventures. It is located at Bandra East. Bandra East is well-connected to other parts of Mumbai. It is close to Bandra West, Kurla, and the Bandra-Kurla Complex (BKC), which is one of Mumbai's major business districts. The locality has excellent road and rail connectivity, with Bandra Railway Station and Kurla Railway Station nearby. The Chhatrapati Shivaji International Airport is also easily accessible from here. It is a 3 Basement+G+15 Storey Tower offering 1 and 2 BHK Residences. 12 wings with 4 flats per floor. Has all modern amenities and facilities. Possession by 2025.
Bandra North QR Code
Bandra North
MahaRERA - P51800014036

Rustomjee Seasons - Wing D

₹ 6.18 Crs. onwards
Bandra East
3 BHK apartments
View Details

Rustomjee Aden

₹ 4.26 Crs. onwards
Bandra East
3 BHK apartments
View Details

Rustomjee Cleon

₹ 1.67 Crs. onwards
Bandra East
1/1½ BHK apartments
View Details

Agami Eternity

₹ 4.12 Crs. onwards
Bandra East
2½/3 BHK apartments
View Details

Rustomjee Stella

₹ 2.61 Crs. onwards
Bandra East
2/3 BHK apartments
View Details

BKC 28

₹ 2.68 Crs. onwards
Bandra East
2 BHK apartments
View Details

X BKC

₹ 6.4 Crs. onwards
Bandra East
2/3/4 BHK apartments
View Details

Leo Eminence

₹ 1.65 Crs. onwards
Bandra East
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Jan 2025
  • Project:
    Bandra North
  • Location:
  • Bandra East, Western Express Highway, Bandra Village
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2025
  • Parking:
    Open;
  • Floors:
    15
Developer Details

Shivalik Ventures Private Limited

  • Developer:
    Shivalik Ventures Private Limited
  • Phone:
    022 40836666
  • Website:
    www.shivalikventures.com
  • Address:
  • 1, Ground Floor, JV House, D.S Babrekar Marg, Prabhadevi Dadar (west), Mumbai 400 028
Project Ratings
Project Brochures
Brochures of Bandra Northby Shivalik Ventures Private Limited
Project Brochures
  • MPE/Brochures/23746/shivalik pdf brochure.pdf
Project Amenities
Amenities offred in Bandra North
LIFESTYLE AMENITIES
Kid's play areaGrand entrance lobbyGymnasiumPower BackupIntercom/CCTVPOP finished wallsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status New Project
Proposed Possession 27 Aug 2023
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2026
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800014036
RERA Project Name Bandra North Gulmohar Avenue
RERA Location Golibar Road, Bandra North, Bandra North, Golibar Road, Mumbai Suburban, 400051
RERA Developer Shivalik Ventures Private Limited
Project RERA Details
Project Type Others
Funding Bank AXIS BANK LTD
Last Modified 09 Feb 2024
Last Retrived 14 Jan 2025
Facilities & Amenities
Facilities, Amenities & Common areas details of Bandra Northlast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Commenced
CHILDERNS PLAY AREA
Not Commenced
Community Buildings
Not Commenced
DG SETS
Not Commenced
Electrical Meter Room, Sub-Station, Receiving Station
Not Commenced
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Commenced
Landscaping & Tree Planting
Not Commenced
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced
Solid Waste Management And Disposal
Not Commenced
SPACE FOR FITNESS CENTER
Not Commenced
Storm Water Drains
Not Commenced
Street Lighting
Not Commenced
Treatment And Disposal Of Sewage And Sullage Water
Not Commenced
Water Conservation, Rain water Harvesting
Not Commenced
Water Supply
Not Commenced
Buildings / Wings in Bandra North
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bandra Northby Shivalik Ventures Private Limitedlast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer

71234 Sq. ft.

Project Area

5705 Sq. ft.

Recreational Open Space

Total 13

Wings / Towers in Project

Apartments Statistics

742 apartments in total
Total
742
Booked
416
Available
326

Saleable Area Statistics (Sq. ft.)

271333 Total
Total
271333
Booked
135930
Available
135403
Total 742 apartments in project. 416 apartments booked. 56% apartments booked.
Total 25207.46 saleable area. 12628.25 apartments booked.
50% area booked.

Deleted

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DeletedAug 20220000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
000 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
0000 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building DeletedCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing AAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
30 Booked50% Booked
50% Booked
59 total apartments / 30 apartments booked. 50% apartments booked.
Work Description in Building Gulmohar Avenue Wing ACompletion
Excavation
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing BAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
58 Booked98% Booked
98% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Gulmohar Avenue Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing CAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
58 Booked100% Booked
100% Booked
58 total apartments / 58 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing DAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
58 Booked100% Booked
100% Booked
58 total apartments / 58 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing EAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
59 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing ECompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing FAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
59 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Gulmohar Avenue Wing FCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gulmohar Avenue Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing GAug 2023151310039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.81 Sq.mts. ( 633 Sq.ft. )15
4 Booked26% Booked
26% Booked
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )44
10 Booked22% Booked
22% Booked
SHOP5.04 Sq.mts. ( 54 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP6.48 Sq.mts. ( 70 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.79 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.83 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.13 Sq.mts. ( 206 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.56 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.78 Sq.mts. ( 213 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.94 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.48 Sq.mts. ( 220 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.99 Sq.mts. ( 226 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 23 apartments booked. 32% apartments booked.
Work Description in Building Gulmohar Avenue Wing GCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing HAug 2023151310048
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.81 Sq.mts. ( 633 Sq.ft. )14
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )45
SHOP7.67 Sq.mts. ( 83 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.25 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.18 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.54 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.28 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.6 Sq.mts. ( 211 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.8 Sq.mts. ( 213 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.37 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.01 Sq.mts. ( 226 Sq.ft. )1
None Booked0% Booked
0% Booked
68 total apartments / 9 apartments booked. 13% apartments booked.
Work Description in Building Gulmohar Avenue Wing HCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing IAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
19 Booked32% Booked
32% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.28 Sq.mts. ( 197 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.47 Sq.mts. ( 210 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.33 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
63 total apartments / 22 apartments booked. 34% apartments booked.
Work Description in Building Gulmohar Avenue Wing ICompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing JAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )58
18 Booked31% Booked
31% Booked
SHOP9.58 Sq.mts. ( 103 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.52 Sq.mts. ( 210 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.05 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.3 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.4 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
63 total apartments / 21 apartments booked. 33% apartments booked.
Work Description in Building Gulmohar Avenue Wing JCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing KAug 2023151310012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )59
SHOP7.95 Sq.mts. ( 86 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.18 Sq.mts. ( 196 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.14 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.42 Sq.mts. ( 209 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.17 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 7 apartments booked. 10% apartments booked.
Work Description in Building Gulmohar Avenue Wing KCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gulmohar Avenue Wing L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulmohar Avenue Wing LAug 202315131009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.96 Sq.mts. ( 322 Sq.ft. )58
12 Booked20% Booked
20% Booked
SHOP8.09 Sq.mts. ( 87 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.5 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.35 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.41 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 12 apartments booked. 19% apartments booked.
Work Description in Building Gulmohar Avenue Wing LCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Shivalik Ventures Private Limited
for Project
Bandra North Gulmohar Avenue
last updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shivalik Ventures Private Limited

Shivalik Ventures Private Limited Shivalik Venture Private Limited is a owned by Jade India.