Chintamani Aryavrat Project at Dadar West by Chintamani Developer (P51900024338)
  • Rating:
  • ()

Chintamani Aryavrat - Dadar West

Project Details, Configuration & Prices
3 BHK1160 Sq.ft. Carpet ₹ 6.38 Cr++
3 BHK1175 Sq.ft. Carpet ₹ 6.46 Cr++
4 BHK1600 Sq.ft. Carpet ₹ 8.80 Cr++
Project overview
Chintamani Aryavrat Project at Dadar West by Chintamani Developer (P51900024338) is a RERA approved Under Construction Project with RERA ID P51900024338 slated to be ready for possession by Dec 2025 with 3/4 BHK apartments / Flats starting from ₹ 6.38 Crs onwards

Chintamani Aryavrat is a Residential Project Developed by the Chintamani Developer. It is located at Dadar West. Dadar West is strategically located and serves as a major transportation hub in Mumbai. It is well-connected to various parts of the city through the Dadar Railway Station, which is one of the busiest railway stations in Mumbai. It offers connectivity to both the Central Railway and Western Railway lines, making it a convenient place for commuters. Just 3 minutes walk to Dadar Station. 5 minutes from the upcoming metro station, Schools & Colleges at 5 minutes walking distance. Siddhivinayak Temple 2 Mins Drive. Well connected to lifestyle, healthcare and education. It is a 2 Basement + 2 Podium + 15 storey residential tower offering 3 and 4 BHK Residences with sundecks. Vastu Compliance Flats with scenic sunset view. Ample Car Parking Space. Surface Car Park. Amenities include Kids Play Area, Gymnasium, Banquet Hall, Mini theatre, Yoga room, Multipurpose Activity Area, Rooftop Swimming Pool etc.
Chintamani Aryavrat QR Code
Chintamani Aryavrat
MahaRERA - P51900024338

Moraj Opulence

₹ 4.85 Crs. onwards
Dadar West
3 BHK apartments
View Details

Shraddha

₹ 2.92 Crs. onwards
Dadar West
1/2/3 BHK apartments
View Details

Kohinoor Square Altissimo

₹ 8.89 Crs. onwards
Dadar West
2½/3/3½ BHK apartments
View Details

Suraj Emmanuel

₹ 1.91 Crs. onwards
Dadar West
1 BHK apartments
View Details

Sugee Nabashruti

₹ 4.15 Crs. onwards
Dadar West
2 BHK apartments
View Details

Sugee Vijayshree

₹ 8.02 Crs. onwards
Dadar West
3/5 BHK apartments
View Details

Sugee Shubhada

₹ 4.27 Crs. onwards
Dadar West
1 BHK apartments
View Details

140 Shivaji Park

₹ 9.98 Crs. onwards
Dadar West
3/5 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Chintamani Aryavrat
  • Location:
  • Dadar West, Palan Sojpal Compund, B Block, S.K Bole Road
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2025
  • Floors:
    15
Developer Details

  • Developer:
    Chintamani Developer
  • Phone:
  • Website:
  • Address:
  • Palan Sojpal Compund, B Block, Dadar West
Project Ratings
Project Brochures
Brochures of Chintamani Aryavratby Chintamani Developer
Project Brochures
  • MPE/Brochures/30630/Floor Plans.pdf
  • MPE/Brochures/30630/Aryavrat Brochure.pdf
Project Amenities
Amenities offred in Chintamani Aryavrat
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaBalconyLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskReception DeskMulti Purpose HallYoga Room
Project RERA Details
RERA Project Status New Project
Proposed Possession 30 Dec 2023
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2024
Litigations Yes
Project RERA Details
MAHA RERA No: P51900024338
RERA Project Name Aryavrat Project
RERA Location Sk Bole Road, Dadar West, Dadar West, Sk Bole Road, Mumbai City, 400028
RERA Developer M/S Chintamani Land And Housing Llp
Project RERA Details
Project Type Residential
Funding Bank STATE BANK OF INDIA
Last Modified 01 Mar 2024
Last Retrived 14 Jan 2025
Facilities & Amenities
Facilities, Amenities & Common areas details of Chintamani Aryavratlast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Building Work To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Building Work To Start
Landscaping & Tree Planting
Building Work To Start
Open Parking
Building Work To Start
Sewerage (Chamber, Lines, Septic Tank , STP)
Building Work To Start
Solid Waste Management And Disposal
Building Work To Start
Storm Water Drains
Building Work To Start
Street Lighting
Building Work To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Building Work To Start
Water Supply
Building Work To Start
Buildings / Wings in Chintamani Aryavrat
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Chintamani Aryavratby Chintamani Developerlast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer

33858 Sq. ft.

Project Area

2751 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

86 apartments in total
Total
86
Booked
54
Available
32

Saleable Area Statistics (Sq. ft.)

66905 Total
Total
66905
Booked
28923
Available
37982
Total 86 apartments in project. 54 apartments booked. 62% apartments booked.
Total 6215.62 saleable area. 2686.99 apartments booked.
43% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202215020000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK85.88 Sq.mts. ( 924 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK59.23 Sq.mts. ( 638 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK70.14 Sq.mts. ( 755 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK71.53 Sq.mts. ( 770 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK108.5 Sq.mts. ( 1168 Sq.ft. )10
3 BHK109.47 Sq.mts. ( 1178 Sq.ft. )7
None Booked0% Booked
0% Booked
4 BHK149.35 Sq.mts. ( 1608 Sq.ft. )9
None Booked0% Booked
0% Booked
30 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress70% done
70% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202222020040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK20.25 Sq.mts. ( 218 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.37 Sq.mts. ( 370 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.51 Sq.mts. ( 371 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK42.66 Sq.mts. ( 459 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK43.77 Sq.mts. ( 471 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK43.99 Sq.mts. ( 474 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK51.1 Sq.mts. ( 550 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK56.67 Sq.mts. ( 610 Sq.ft. )18
18 Booked100% Booked
100% Booked
2 BHK60.2 Sq.mts. ( 648 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK60.39 Sq.mts. ( 650 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK64.38 Sq.mts. ( 693 Sq.ft. )1
1 Booked100% Booked
100% Booked
56 total apartments / 53 apartments booked. 94% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Chintamani Developer
for Project
Aryavrat Project
last updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Chintamani Developer