Gurukrupa Dhyanam Project at Andheri West by Gurukrupa Realcon Infrastructure Llp (P51800055801)
  • Rating:
  • ()

Gurukrupa Dhyanam - Andheri West

Project Details, Configuration & Prices
2 BHK713 Sq.ft. Carpet ₹ 3.70 Cr ++
2 BHK731 Sq.ft. Carpet ₹ 3.79 Cr ++
3 BHK952 Sq.ft. Carpet ₹ 4.93 Cr ++
Project overview
Gurukrupa Dhyanam Project at Andheri West by Gurukrupa Realcon Infrastructure Llp (P51800055801) is a RERA approved Under Construction Project with RERA ID P51800055801 slated to be ready for possession by Mar 2027 with 2/3 BHK apartments / Flats starting from N/A onwards

Discover Gurukrupa Dhyanam in Versova, a premium boutique residential project offering thoughtfully designed 2 & 3 BHK flats with carpet areas ranging from 714 to 952 sq ft. Strategically located near New Link Road, Versova Road, and Swami Vivekanand Road with seamless access to the Western Express Highway, this under-construction tower ensures excellent connectivity across Mumbai’s key commercial and lifestyle hubs. This G+3 podium + 18/19 storey development features only 58 exclusive residences, making it ideal for families and professionals seeking privacy and upscale living in Andheri West. The project offers podium and rooftop lifestyle amenities including a swimming pool, open-sky gym, jogging track, amphitheatre, yoga and meditation spaces, senior citizen zones, and kids’ play areas. Built using advanced MIVAN construction technology with RCC frame structure, seismic resistance, vitrified tile flooring, and branded fittings, each flat is crafted for durability and refined comfort. Located close to Four Bungalows Bus Stop, St. Louis Convent High School, healthcare facilities, retail outlets, and popular Versova landmarks, Gurukrupa Dhyanam offers the perfect blend of convenience, luxury, and connectivity in one of Mumbai’s most sought-after residential neighborhoods. Ideal for homebuyers and investors looking for premium flats in Versova with modern amenities and strong appreciation potential.
Gurukrupa Dhyanam QR Code
Gurukrupa Dhyanam
MahaRERA - P51800055801

Transcon Triumph - Tower 4

₹ 1.79 Crs. onwards
Andheri West
1/2 BHK apartments
View Details

Adani Linkbay Residences

₹ 4.99 Crs. onwards
Andheri West
3/4 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 2.85 Crs. onwards
Andheri West
Office BHK apartments
View Details

Kalpataru Lokhandwala New Launch

₹ 7.8 Crs. onwards
Andheri West
3/4/4½ BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details

Mesacon Greens

₹ 3.07 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details
Andheri West
4/4½ BHK apartments
View Details
Project Details
Project details were last updated in Feb 2026
  • Project:
    Gurukrupa Dhyanam
  • Location:
  • Andheri West, J P Road, Four Banglows, Ratan Nagar
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2027
Developer Details

  • Developer:
    Gurukrupa Realcon Infrastructure Llp
  • Phone:
    7304999825
  • Website:
    www.gurukrupagroup.in
  • Address:
  • C 106, Vashi Plaza, Sector 17, Vashi Plaza, Vashi, 400703
Project Ratings
Project Amenities
Amenities offred in Gurukrupa Dhyanam
Project RERA Details
RERA Project Status New
Proposed Possession 31 Mar 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800055801
RERA Project Name Gurukrupa Dhyanam
RERA Location Q8uivi3tcqwzjzvrsde96q==
RERA Developer Gurukrupa Realcon Infrabuild Llp
Architect Ingenious Architects
Project RERA Details
Project Type Others
Funding Bank IDBI BANK
Last Modified 11 Nov 2025
Last Retrived 13 Feb 2026

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of Gurukrupa Dhyanamlast updated on 13 Feb 2026 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Noc Obtained
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approval Obtained From Fire Department
Landscaping & Tree Planting
As Per Noc Obtained From Tree Authority
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Bmc Rules And Regulations
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Drawings Obtained From Consultants
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per The Drawings Obtained
Water Supply
As Per The Drawings Obtained From Consultant
Buildings / Wings in Gurukrupa Dhyanam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gurukrupa Dhyanamby Gurukrupa Realcon Infrastructure Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA. Disclaimer

30306 Sq. ft.

Project Area

6061 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

111 apartments in total
Total
111
Booked
82
Available
29

Saleable Area Statistics (Sq. ft.)

82382 Total
Total
82382
Booked
61123
Available
21259
Total 111 apartments in project. 82 apartments booked. 73% apartments booked.
Total 7653.43 saleable area. 5678.46 apartments booked.
74% area booked.

Wing A And Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A And Wing BMar 2027181013135135
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.6 Sq.mts. ( 631 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK61.19 Sq.mts. ( 659 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK61.79 Sq.mts. ( 665 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK61.85 Sq.mts. ( 666 Sq.ft. )32
19 Booked59% Booked
59% Booked
2 BHK63.45 Sq.mts. ( 683 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK64.85 Sq.mts. ( 698 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK83.55 Sq.mts. ( 899 Sq.ft. )32
25 Booked78% Booked
78% Booked
2 BHK91.81 Sq.mts. ( 988 Sq.ft. )6
4 Booked66% Booked
66% Booked
Shop52.89 Sq.mts. ( 569 Sq.ft. )10
6 Booked60% Booked
60% Booked
111 total apartments / 82 apartments booked. 73% apartments booked.
Work Description in Building Wing A And Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked
Project Consultants
Channel Partners Registered by Developer
Gurukrupa Realcon Infrastructure Llp
for Project
Gurukrupa Dhyanam
last updated on 13 Feb 2026 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Gurukrupa Realcon Infrastructure Llp