Mauli Krupa Project at Ghansoli by Vighnesh Construction (P51700011488)
  • Rating: 3.5
  • (1)

Mauli Krupa - Ghansoli

Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Mauli Krupa Project at Ghansoli by Vighnesh Construction (P51700011488) a Sold Out Project with 1 BHK apartments / Flats starting from N/A onwards

Mauli Krupa Developed by VIGHNESH CONSTRUCTIONS. Offer Spacious 1 BHK.
Mauli Krupa QR Code
Mauli Krupa
MahaRERA - P51700011488

Grand Plaza

₹ 1.9 Crs. onwards
Ghansoli
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Mauli Krupa
  • Location:
  • Ghansoli, Plot No.22, Sector 15
  • Const. Stage:
    Sold Out
  • Possession:
    Aug 2014
  • Parking:
    Open;
  • Floors:
    4
Developer Details

  • Developer:
    Vighnesh Construction
  • Phone:
  • Website:
  • Address:
  • Shop No.116, Om Arcade Shopping Mall, Sector - 20, Opp. Turbhe Rly. STn. Near NMMT Depot, Turbhe, Navi Mumbai.
Project Ratings
Project Amenities
Amenities offred in Mauli Krupa
LIFESTYLE AMENITIES
High speed elevatorsPOP finished wallsVitrified flooring

Most active Channel Partners, Real Estate Agents in Ghansoli

Facilities & Amenities
Facilities, Amenities & Common areas details of Mauli Krupalast updated on as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter To Be Connected After Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Main Line To Be Connected After Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Na
Water Supply
Main Line To Be Connected After O.C
Buildings / Wings in Mauli Krupa
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mauli Krupaby Vighnesh Constructionlast updated on as per information obtained from MARA RERA. Disclaimer

0 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
5
Available
13

Saleable Area Statistics (Sq. ft.)

5859 Total
Total
5859
Booked
1332
Available
4526
Total 18 apartments in project. 5 apartments booked. 27% apartments booked.
Total 544.28 saleable area. 123.78 apartments booked.
23% area booked.

Mauli Krupa

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mauli KrupaJan 19005101026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.02 Sq.mts. ( 259 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL24.06 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL24.94 Sq.mts. ( 268 Sq.ft. )8
4 Booked50% Booked
50% Booked
RESIDENTIAL37.08 Sq.mts. ( 399 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL37.09 Sq.mts. ( 399 Sq.ft. )4
None Booked0% Booked
0% Booked
18 total apartments / 5 apartments booked. 27% apartments booked.
Work Description in Building Mauli KrupaCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Vighnesh Construction
for Project
last updated on as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Vighnesh Construction