Rishabh Platina Project at Lower Parel by Rishabh Developers (P51900015088)
  • Rating: 5.0
  • (28)

Rishabh Platina - Lower Parel

Project Details, Configuration & Prices
3 BHK1380 Sq.ft. Carpet ₹ 6.75 Cr All Inc.
Project overview
Rishabh Platina Project at Lower Parel by Rishabh Developers (P51900015088) is a Ready Possession Project with 3 BHK apartments / Flats starting from ₹ 6.75 Crs onwards

Rishabh Platina is a Residential Project Developed by Rishabh Developers. It is located at Lower Parel. well-connected to other parts of Mumbai through various modes of transportation. provides convenient access to different parts of the city. Additionally, the area is served by buses, taxis, and auto-rickshaws, making it easily accessible for commuters. Educational institutes, malls, entertainment, healthcare etc are in close proximity. Rishabh Platina is a 20 storey tower with luxury 2 and 3 BHK Residences. Bareshell apartments. The project offers array of world class amenities designed to elevate your lifestyle and provide a truly luxurious living experience. The highlight of Platina is the stunning sky garden, a private oasis in the sky where you can unwind, socialize, and revel in the beauty of nature. Amenities include Terrace garden, indoor games, gym, lobby area and many more. RERA approved OC Received project.
Rishabh Platina QR Code
Rishabh Platina
MahaRERA - P51900015088

Lodha World One

₹ 12.09 Crs. onwards
Lower Parel
3/4 BHK apartments
View Details

Lodha Signet

₹ 2.5 Crs. onwards
Lower Parel
Office BHK apartments
View Details

Lodha Ciel

₹ 40 Crs. onwards
Lower Parel
4 BHK apartments
View Details

Indiabulls Sky Forest

₹ 8.38 Crs. onwards
Lower Parel
3/3½/4/4½ BHK apartments
View Details

Fortuna Blue

₹ 1.71 Crs. onwards
Lower Parel
1/2 BHK apartments
View Details

Lodha Vista

₹ 3.58 Crs. onwards
Lower Parel
2/3 BHK apartments
View Details

Arihant Towers

₹ 3.29 Crs. onwards
Lower Parel
2/3/4 BHK apartments
View Details

Sarvesh One

₹ 1.61 Crs. onwards
Lower Parel
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Rishabh Platina
  • Location:
  • Lower Parel, Opp Big Bazar
  • Const. Stage:
    Ready Possession
  • Possession:
  • Floors:
    20
Developer Details

  • Developer:
    Rishabh Developers
  • Phone:
    022 6111 6666
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of Rishabh Platinaby Rishabh Developers
Project Brochures
  • MPE/Brochures/20434/Rishabh Platina Brochure.pdf
Project Amenities
Amenities offred in Rishabh Platina
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAir ConditionersAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New Project
Proposed Possession 30 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900015088
RERA Project Name Platina
RERA Location Senapati Bapat Marg, Lower Parel, Lower Parel, Senapati Bapat Marg, Mumbai City, 400013
RERA Developer Om Shanti City Development Co
Project RERA Details
Project Type Residential
Funding Bank AXIS BANK
Last Modified 17 Feb 2024
Last Retrived 14 Jan 2025
Facilities & Amenities
Facilities, Amenities & Common areas details of Rishabh Platinalast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Provided Before Completion Of Bldng
Energy management100% completed
95% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
To Be Provided Before Completionof Bldng
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewerage Chamber &Amp; Lines Are To Be Co
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Pleted Onsit
Street Lighting
To Be Provided Before Completionof Bldng
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Municipal Wateer Supply To Be Provided Before Comp
Buildings / Wings in Rishabh Platina
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rishabh Platinaby Rishabh Developerslast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer

10535 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
9
Available
16

Saleable Area Statistics (Sq. ft.)

26818 Total
Total
26818
Booked
9560
Available
17259
Total 25 apartments in project. 9 apartments booked. 36% apartments booked.
Total 2491.49 saleable area. 888.12 apartments booked.
36% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202311113001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.19 Sq.mts. ( 573 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK53.64 Sq.mts. ( 577 Sq.ft. )2
None Booked0% Booked
0% Booked
5 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202311121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK61.53 Sq.mts. ( 662 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK119.39 Sq.mts. ( 1285 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK128.4 Sq.mts. ( 1382 Sq.ft. )14
5 Booked35% Booked
35% Booked
20 total apartments / 9 apartments booked. 45% apartments booked.
Work Description in Building B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Rishabh Developers
for Project
Platina
last updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Rishabh Developers