Shantee Spring Field Project at Naigaon East by Shantee Homes (P99000020393)
  • Rating:
  • ()

Shantee Spring Field - Naigaon East

Project Details, Configuration & Prices
1 BHK455 Sq.ft. Carpet ₹ Call for Price
Row House244 Sq.ft. Carpet ₹ Call for Price
Row House548 Sq.ft. Carpet ₹ Call for Price
Project overview
Shantee Spring Field Project at Naigaon East by Shantee Homes (P99000020393) is a RERA approved Under Construction Project with RERA ID P99000020393 slated to be ready for possession by Feb 2025 with 1/Row House BHK apartments / Flats starting from N/A onwards

"Spring Field": Magnificent villas & row houses offer an emotion-filled escape. Each home maximizes space, adorned with play areas, games, and a clubhouse. Modern amenities, tranquility, and meticulous design create Naigaon's latest landmark. An invitation to a serene lifestyle, ensuring extreme comfort and convenience. Enjoy calm and peace, forget the traumas of a busy life. "Spring Field" promises optimal value, modern amenities, and a blend of convenience and style. Join us in embracing an upgraded lifestyle, where comfort meets elegance.
Shantee Spring Field QR Code
Shantee Spring Field
MahaRERA - P99000020393
Naigaon East
1/2 BHK apartments
View Details

Q Maple Industrial Estate

₹ 58.82 Lacs. onwards
Naigaon East
Office BHK apartments
View Details

Sunteck One World

₹ 39.25 Lacs. onwards
Naigaon East
1/2 BHK apartments
View Details

Sunteck West World

₹ 41.5 Lacs. onwards
Naigaon East
1/2 BHK apartments
View Details

Sunteck Maxx World

₹ 44.25 Lacs. onwards
Naigaon East
1/2/3 BHK apartments
View Details

Ornate Serenity

₹ 46.92 Lacs. onwards
Naigaon East
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Shantee Spring Field
  • Location:
  • Naigaon East, Kaman
  • Const. Stage:
    Under Construction
  • Possession:
    Feb 2025
  • Parking:
    Open Reserved;
Developer Details

  • Developer:
    Shantee Homes
  • Phone:
    02502331171
  • Website:
    www.shanteehomes.com
  • Address:
Project Ratings
Project Brochures
Brochures of Shantee Spring Fieldby Shantee Homes
Project Brochures
  • MPE/Brochures/30817/Spring Field.pdf
Project Amenities
Amenities offred in Shantee Spring Field
LIFESTYLE AMENITIES
Outdoor GamesAluminium Sliding WindowsPOP finished wallsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New Project
Proposed Possession 28 Feb 2025
Revised Possession 01 Jan 1900
Extended Possession 31 Jan 2026
Litigations No Litigations
Project RERA Details
MAHA RERA No: P99000020393
RERA Project Name Spring Field
RERA Location Kaman, Kaman, Kaman, Palghar, 401208
RERA Developer Shantee Homes Realty Llp
Architect Mufaddal Merchant
Project RERA Details
Project Type Residential
Funding Bank THE COSMOS CO-OP BANK LTD
Last Modified 12 Feb 2024
Last Retrived 13 Jan 2025

Most active Channel Partners, Real Estate Agents in Naigaon East

Facilities & Amenities
Facilities, Amenities & Common areas details of Shantee Spring Fieldlast updated on 13 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
On Possession
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Borewell
Buildings / Wings in Shantee Spring Field
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shantee Spring Fieldby Shantee Homeslast updated on 13 Jan 2025 as per information obtained from MARA RERA. Disclaimer

292454 Sq. ft.

Project Area

37674 Sq. ft.

Recreational Open Space

Total 14

Wings / Towers in Project

Apartments Statistics

277 apartments in total
Total
277
Booked
47
Available
230

Saleable Area Statistics (Sq. ft.)

71605 Total
Total
71605
Booked
16830
Available
54775
Total 277 apartments in project. 47 apartments booked. 16% apartments booked.
Total 6652.31 saleable area. 1563.56 apartments booked.
24% area booked.

Cluster 2 Type B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Cluster 2 Type B1Feb 20242100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential15.39 Sq.mts. ( 166 Sq.ft. )24
None Booked0% Booked
0% Booked
Residential17.07 Sq.mts. ( 184 Sq.ft. )2
None Booked0% Booked
0% Booked
Residential17.68 Sq.mts. ( 190 Sq.ft. )21
None Booked0% Booked
0% Booked
Residential18 Sq.mts. ( 194 Sq.ft. )12
None Booked0% Booked
0% Booked
Residential20.47 Sq.mts. ( 220 Sq.ft. )13
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Cluster 2 Type B1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Cluster 3 Type B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Cluster 3 Type B2Feb 20242100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential14.48 Sq.mts. ( 156 Sq.ft. )2
None Booked0% Booked
0% Booked
Residential15.39 Sq.mts. ( 166 Sq.ft. )8
None Booked0% Booked
0% Booked
Residential16.48 Sq.mts. ( 177 Sq.ft. )2
None Booked0% Booked
0% Booked
Residential17.68 Sq.mts. ( 190 Sq.ft. )8
None Booked0% Booked
0% Booked
Residential18 Sq.mts. ( 194 Sq.ft. )5
None Booked0% Booked
0% Booked
Residential20.47 Sq.mts. ( 220 Sq.ft. )5
None Booked0% Booked
0% Booked
30 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Cluster 3 Type B2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure

Proposed Bldg

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Proposed BldgFeb 20243100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL334.35 Sq.mts. ( 3599 Sq.ft. )0
None Booked0% Booked
0% Booked
Residential334.45 Sq.mts. ( 3600 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Proposed BldgCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 1 Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 1 Type AFeb 2024310310031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.63 Sq.mts. ( 373 Sq.ft. )31
30 Booked96% Booked
96% Booked
31 total apartments / 30 apartments booked. 96% apartments booked.
Work Description in Building Resi Row House Cluster 1 Type ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Stilt Floor
work-in-progress98% done
98% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Resi Row House Cluster 10 Type C3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 10 Type C3Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE21.78 Sq.mts. ( 234 Sq.ft. )6
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 10 Type C3Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 11 Type C4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 11 Type C4Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.5 Sq.mts. ( 242 Sq.ft. )7
None Booked0% Booked
0% Booked
7 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 11 Type C4Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 12 Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 12 Type DFeb 2024310160016
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.98 Sq.mts. ( 549 Sq.ft. )16
4 Booked25% Booked
25% Booked
16 total apartments / 4 apartments booked. 25% apartments booked.
Work Description in Building Resi Row House Cluster 12 Type DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked

Resi Row House Cluster 13 Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 13 Type DFeb 20243104004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE50.98 Sq.mts. ( 549 Sq.ft. )4
1 Booked25% Booked
25% Booked
4 total apartments / 1 apartments booked. 25% apartments booked.
Work Description in Building Resi Row House Cluster 13 Type DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
work-in-progress95% done
95% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked

Resi Row House Cluster 4 Type C2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 4 Type C2Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Resi Row House22.48 Sq.mts. ( 242 Sq.ft. )11
None Booked0% Booked
0% Booked
11 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 4 Type C2Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 5 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 5 Type C1Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.48 Sq.mts. ( 242 Sq.ft. )12
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 5 Type C1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress28% done
28% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 6 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 6 Type C1Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.48 Sq.mts. ( 242 Sq.ft. )52
52 total apartments / 6 apartments booked. 11% apartments booked.
Work Description in Building Resi Row House Cluster 6 Type C1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Resi Row House Cluster 7 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 7 Type C1Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.48 Sq.mts. ( 242 Sq.ft. )12
6 Booked50% Booked
50% Booked
12 total apartments / 6 apartments booked. 50% apartments booked.
Work Description in Building Resi Row House Cluster 7 Type C1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Resi Row House Cluster 8 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 8 Type C1Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.48 Sq.mts. ( 242 Sq.ft. )12
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 8 Type C1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure

Resi Row House Cluster 9 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Resi Row House Cluster 9 Type C1Feb 20241100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESI ROW HOUSE22.48 Sq.mts. ( 242 Sq.ft. )12
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Resi Row House Cluster 9 Type C1Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Shantee Homes
for Project
Spring Field
last updated on 13 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shantee Homes