Shraddha Evoque Project at Bhandup by Shraddha Landmark Pvt. Ltd (P51800008864)
  • Rating: 5.0
  • (60)

Shraddha Evoque - Bhandup

Shraddha Landmark Pvt. Ltd
Project Details, Configuration & Prices
1 BHK366 Sq.ft. Carpet ₹ 65 Lacs++
2 BHK535 Sq.ft. Carpet ₹ 95 Lacs++
Project overview
Shraddha Evoque Project at Bhandup by Shraddha Landmark Pvt. Ltd (P51800008864) is a RERA approved Under Construction Project with RERA ID P51800008864 slated to be ready for possession by Dec 2024 with 1/2 BHK apartments / Flats starting from ₹ 61.63 Lakh onwards

Shraddha Evoque is a Residential Project Developed by the Shraddha Landmark Pvt ltd. It is located at Bhandup West. well-connected to various parts of the city and neighbouring suburbs. The Bhandup Railway Station provides suburban train services, connecting the area to the Mumbai local train network. The construction is designed as a big town ship and also having commercial space that is best option of Business Purpose.This project handiwork is in close proximity to major IT campuses, your workplace could be just a stone’s throw away. Just 15 minutes away from Nahur and Kanjurmarg Railway Station. 4 kms. Away from Western Express Highway. Close proximity to major business hubs, healthcare, educational institutes etc. It is a 40 storey tower offering 1 and 2 BHK Residences. Has all modern amenities and facilities.
Shraddha Evoque QR Code
Shraddha Evoque
MahaRERA - P51800008864

Rustomjee Bella

₹ 89.65 Lacs. onwards
Bhandup
1/2 BHK apartments
View Details

Fairmont

₹ 70 Lacs. onwards
Bhandup
1 BHK apartments
View Details

Godrej Nurture

₹ 1.65 Crs. onwards
Bhandup
2/3 BHK apartments
View Details

Ajmera 78 Lake Town

₹ 78.11 Lacs. onwards
Bhandup
1/2½ BHK apartments
View Details

Srishti Pride

₹ 1.15 Crs. onwards
Bhandup
1/2 BHK apartments
View Details

Sai Indu

₹ 69 Lacs. onwards
Bhandup
Office BHK apartments
View Details

Arunoday Heritage

₹ 1.15 Crs. onwards
Bhandup
1 BHK apartments
View Details

Neo Skies

₹ 34 Lacs. onwards
Bhandup
1/1 RK BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Shraddha Evoque
  • Location:
  • Bhandup, Lake Road, Next to Mayuresh Park, Opp Marathon Mbryo
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2024
  • Parking:
    Open;
  • Floors:
    40
Developer Details

Shraddha Landmark Pvt. Ltd

  • Developer:
    Shraddha Landmark Pvt. Ltd
  • Phone:
    022-25010465
  • Website:
    www.shraddhalandmark.in
  • Address:
  • 301, Sai Heritage, Tilak Road Above Axis Bank, Ghatkopar East, Mumbai - 75
Project Ratings
Project Amenities
Amenities offred in Shraddha Evoque
LIFESTYLE AMENITIES
Power BackupOutdoor GamesHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskReception DeskMulti Purpose Hall
Project RERA Details
RERA Project Status On-Going Project
Proposed Possession 31 Dec 2022
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800008864
RERA Project Name Shraddha Evoque
RERA Location Lake Road, Ram Rahim Udyog Nagar, Sadan Wadi, Bhandup West, Ram Rahim Udyog Nagar, Sadan Wadi, Bhandup West, Lake Road, Mumbai Suburban, 400078
RERA Developer Shraddha Landmark Private Limited
Architect Vijay Turbadkar
Project RERA Details
Project Type Others
Funding Bank HDFC BANK LTD
Last Modified 01 Feb 2024
Last Retrived 15 Jan 2025

Most active Channel Partners, Real Estate Agents in Bhandup

Facilities & Amenities
Facilities, Amenities & Common areas details of Shraddha Evoquelast updated on 15 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
Only Electric Meter Room And Substation
Energy management
Na
Fire Protection And Fire Safety Requirements70% completed
70% Complete
Noc From Mcgm And Built By Developer
Landscaping & Tree Planting90% completed
90% Complete
Noc From Mcgm And Built By Developer
Open Parking
Na
OTHER
Na
Pump Room70% completed
70% Complete
Developer
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Chamber Line And Stp
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Noc From Mcgm And Built By Developer
Street Lighting
Noc From Mcgm And Built By Developer
Treatment And Disposal Of Sewage And Sullage Water
Stp Provided By Developer
Water Conservation, Rain water Harvesting90% completed
90% Complete
Rain Water Harvesting By Developer
Water Supply90% completed
90% Complete
Noc From Mcgm And Built By Developer
Buildings / Wings in Shraddha Evoque
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shraddha Evoqueby Shraddha Landmark Pvt. Ltdlast updated on 15 Jan 2025 as per information obtained from MARA RERA. Disclaimer

112398 Sq. ft.

Project Area

11217 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

628 apartments in total
Total
628
Booked
516
Available
112

Saleable Area Statistics (Sq. ft.)

257587 Total
Total
257587
Booked
204335
Available
53252
Total 628 apartments in project. 516 apartments booked. 82% apartments booked.
Total 23930.44 saleable area. 18983.21 apartments booked.
79% area booked.

Sale Tower 1 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing ADec 2022221011017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK21.27 Sq.mts. ( 229 Sq.ft. )20
20 Booked100% Booked
100% Booked
2 BHK47.29 Sq.mts. ( 509 Sq.ft. )42
42 Booked100% Booked
100% Booked
SHOP NO 115.68 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO 213.68 Sq.mts. ( 147 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO 712.05 Sq.mts. ( 130 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO 814.56 Sq.mts. ( 157 Sq.ft. )1
None Booked0% Booked
0% Booked
68 total apartments / 67 apartments booked. 98% apartments booked.
Work Description in Building Sale Tower 1 Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 1 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing BDec 2022221011029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.42 Sq.mts. ( 349 Sq.ft. )53
51 Booked96% Booked
96% Booked
2 BHK47.29 Sq.mts. ( 509 Sq.ft. )32
32 Booked100% Booked
100% Booked
3 BHK54.07 Sq.mts. ( 582 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 84 apartments booked. 97% apartments booked.
Work Description in Building Sale Tower 1 Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 1 Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing CDec 2022221011025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.42 Sq.mts. ( 349 Sq.ft. )83
81 Booked97% Booked
97% Booked
SHOP NO 2447.8 Sq.mts. ( 515 Sq.ft. )1
1 Booked100% Booked
100% Booked
84 total apartments / 82 apartments booked. 97% apartments booked.
Work Description in Building Sale Tower 1 Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 1 Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing DDec 2022401011024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34 Sq.mts. ( 366 Sq.ft. )78
77 Booked98% Booked
98% Booked
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )35
35 Booked100% Booked
100% Booked
2 BHK48.59 Sq.mts. ( 523 Sq.ft. )78
27 Booked34% Booked
34% Booked
2 BHK49.7 Sq.mts. ( 535 Sq.ft. )75
44 Booked58% Booked
58% Booked
SHOP NO 2812.73 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 2912.82 Sq.mts. ( 138 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3010.41 Sq.mts. ( 112 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3117.56 Sq.mts. ( 189 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3238.09 Sq.mts. ( 410 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3310.13 Sq.mts. ( 109 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3421.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 3520.25 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
274 total apartments / 183 apartments booked. 66% apartments booked.
Work Description in Building Sale Tower 1 Wing DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress59% done
59% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress61% done
61% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress68% done
68% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked

Sale Tower 1 Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing EDec 2022221011024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
NA0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Sale Tower 1 Wing ECompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 1 Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 1 Wing FDec 2022221011025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.42 Sq.mts. ( 349 Sq.ft. )100
100 Booked100% Booked
100% Booked
100 total apartments / 100 apartments booked. 100% apartments booked.
Work Description in Building Sale Tower 1 Wing FCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 2Dec 20227101002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL 136.42 Sq.mts. ( 392 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL 236.46 Sq.mts. ( 392 Sq.ft. )4
None Booked0% Booked
0% Booked
COMMERCIAL 341.44 Sq.mts. ( 446 Sq.ft. )3
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sale Tower 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sale Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Tower 3Dec 20227101002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL 137.38 Sq.mts. ( 402 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL 235.9 Sq.mts. ( 386 Sq.ft. )4
None Booked0% Booked
0% Booked
COMMERCIAL 339.7 Sq.mts. ( 427 Sq.ft. )3
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sale Tower 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Shraddha Landmark Pvt. Ltd
for Project
Shraddha Evoque
last updated on 15 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shraddha Landmark Pvt. Ltd

Shraddha Landmark Pvt. Ltd Shraddha Landmark believes in itself of standing for excellence. It is a company which not only believes in its own dreams but also strives to fulfill dreams of all its stakeholders. Shraddha Landmark creates homes for all strata of the society with low cost housing, compact housing, premium housing and super premium housing.