Shristi Residency Project at Jogeshwari by Nicco (P51800031167)
  • Rating: 4.1
  • (27)

Shristi Residency - Jogeshwari

Project Details, Configuration & Prices
1 BHK435 Sq.ft. Carpet ₹ 1.03 Cr ++
2 BHK595 Sq.ft. Carpet ₹ 1.40 Cr ++
2 BHK615 Sq.ft. Carpet ₹ 1.45 Cr ++
Project overview
Shristi Residency Project at Jogeshwari by Nicco (P51800031167) is a RERA approved Under Construction Project with RERA ID P51800031167 slated to be ready for possession by Dec 2024 with 1/2 BHK apartments / Flats starting from ₹ 99 Lakh onwards

Shristi Residency is a Residential Project Developed by the Nicco. It is located at Jogeshwari. Jogeshwari enjoys excellent connectivity to various parts of Mumbai. It is well-connected through the Western Express Highway, linking it to the central and southern parts of the city. The Jogeshwari railway station serves as a significant suburban railway hub on the Western Line, making it convenient for daily commuters. It is a 19 storey tower with 1, 1.5 and 2 BHK Residences. Amenities include open to sky, gym, swimming pool, steam room, jacuzzi, jogging track, lounge, indoor games, library and many more. All modern amenities and facilities. Builder possession by December 2024.
Shristi Residency QR Code
Shristi Residency
MahaRERA - P51800031167

Lodha Belair

₹ 1.87 Crs. onwards
Jogeshwari
2/3 BHK apartments
View Details

Golden Heights

₹ 1.25 Crs. onwards
Jogeshwari
1/1½/2 BHK apartments
View Details

Roswalt Zaiden

₹ 1.18 Crs. onwards
Jogeshwari
1/2/3/4 BHK apartments
View Details

Sigma Jade

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Gardens

₹ 1.09 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Aim Paradise

₹ 1 Crs. onwards
Jogeshwari
1/2 BHK apartments
View Details

Lashkaria Pearl

₹ 79.92 Lacs. onwards
Jogeshwari
1 BHK apartments
View Details

Aim Horizon

₹ 91.44 Lacs. onwards
Jogeshwari
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Shristi Residency
  • Location:
  • Jogeshwari, Next to Hema Industries
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2024
  • Floors:
    19
Developer Details

  • Developer:
    Nicco
  • Phone:
    022 2682 1767
  • Website:
    www.nicco.co.in
  • Address:
  • 201/A, Vertex Vikas, Sir M.V Road, Andheri East
Project Ratings
Project Brochures
Brochures of Shristi Residencyby Nicco
Project Brochures
  • MPE/Brochures/29133/Shristi Residency Brochure.pdf
Project Amenities
Amenities offred in Shristi Residency
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasGranite PlatformSecurity Help DeskReception DeskMassage Room
Project RERA Details
RERA Project Status New Project
Proposed Possession 31 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800031167
RERA Project Name Shristi Residency - Phase 1
RERA Location Andheri, Andheri, Andheri, Andheri, Mumbai Suburban, 400060
RERA Developer Ranbir Real Estate And Developers Llp
Architect S. S. Associates.
Project RERA Details
Project Type Others
Funding Bank AXIS BANK LTD
Last Modified 15 Mar 2023
Last Retrived 03 Apr 2023

Most active Channel Partners, Real Estate Agents in Jogeshwari

Facilities & Amenities
Facilities, Amenities & Common areas details of Shristi Residencylast updated on 03 Apr 2023 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements40% completed
40% Complete
Wip
Landscaping & Tree Planting
Develpoer
Open Parking
Wip
Pump Room
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)35% completed
35% Complete
Mcgm
Solid Waste Management And Disposal35% completed
35% Complete
Wip
Storm Water Drains35% completed
35% Complete
Developer
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water35% completed
35% Complete
Wip
Water Conservation, Rain water Harvesting35% completed
35% Complete
Wip
Water Supply40% completed
40% Complete
Mcgm
Buildings / Wings in Shristi Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shristi Residencyby Nicco last updated on 03 Apr 2023 as per information obtained from MARA RERA. Disclaimer

21625 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

221 apartments in total
Total
221
Booked
154
Available
67

Saleable Area Statistics (Sq. ft.)

119504 Total
Total
119504
Booked
80084
Available
39420
Total 221 apartments in project. 154 apartments booked. 69% apartments booked.
Total 11102.21 saleable area. 7440 apartments booked.
67% area booked.

Shristi Residency - Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shristi Residency - Wing ADec 2024191000043
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )69
50 Booked72% Booked
72% Booked
3 BHK68.09 Sq.mts. ( 733 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.59 Sq.mts. ( 114 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop11.98 Sq.mts. ( 129 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop21.83 Sq.mts. ( 235 Sq.ft. )2
1 Booked50% Booked
50% Booked
76 total apartments / 55 apartments booked. 72% apartments booked.
Work Description in Building Shristi Residency - Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shristi Residency - Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shristi Residency - Wing BDec 2024191000030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.41 Sq.mts. ( 435 Sq.ft. )35
34 Booked97% Booked
97% Booked
2 BHK55.27 Sq.mts. ( 595 Sq.ft. )36
20 Booked55% Booked
55% Booked
71 total apartments / 54 apartments booked. 76% apartments booked.
Work Description in Building Shristi Residency - Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shristi Residency - Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shristi Residency - Wing CDec 2024191000032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.41 Sq.mts. ( 435 Sq.ft. )36
35 Booked97% Booked
97% Booked
2 BHK55.27 Sq.mts. ( 595 Sq.ft. )18
7 Booked38% Booked
38% Booked
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )19
3 BHK64.19 Sq.mts. ( 691 Sq.ft. )1
1 Booked100% Booked
100% Booked
74 total apartments / 45 apartments booked. 60% apartments booked.
Work Description in Building Shristi Residency - Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Nicco
for Project
Shristi Residency - Phase 1
last updated on 03 Apr 2023 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Nicco