Swastik Project at Borivali West by Reliance Corporation (P51800054494)
  • Rating:
  • ()

Swastik - Borivali West

Project Details, Configuration & Prices
1 BHK365 Sq.ft. Carpet ₹ 1.04 Cr ++
2 BHK604 Sq.ft. Carpet ₹ 1.72 Cr ++
Office446 Sq.ft. Carpet ₹ 1.56 Cr ++
Project overview
Swastik Project at Borivali West by Reliance Corporation (P51800054494) is a RERA approved Under Construction Project with RERA ID P51800054494 slated to be ready for possession by Sep 2026 with 1/2/Office BHK apartments / Flats starting from ₹ 1.04 Crs onwards

Discover tranquility and luxury at Swastik, a Stilt+10 storey tower in Borivali West offering spacious 1 & 2 BHK residences and offices. Each home features premium interiors, including vitrified flooring, granite kitchen platforms, designer bathrooms, and elegant fittings. Built with an earthquake-resistant RCC frame, the property boasts a decorative entrance lobby, branded elevators, and modern fire safety systems. Exclusive amenities include an open gym, fitness track, kids' play area, life-size Ludo board, barbeque deck, yoga zones, and gazebo seating lounges. Perfectly located in Borivali West with excellent connectivity, Swastik blends thoughtful design with serene living for families and professionals.
Swastik QR Code
Swastik
MahaRERA - P51800054494

Romell Serene

₹ 1.27 Crs. onwards
Borivali West
1/3 BHK apartments
View Details

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.07 Crs. onwards
Borivali West
1/1 RK/2 BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Kalpataru Advay

₹ 4.66 Crs. onwards
Borivali West
3/4 BHK apartments
View Details

Avyukta Vedant

₹ 1.09 Crs. onwards
Borivali West
1/1½/2/2½ BHK apartments
View Details

Sheetal Meghdoot

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Paradigm Anantaara

₹ 1.99 Crs. onwards
Borivali West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Swastik
  • Location:
  • Borivali West, SV Road, Next to Vijay Sales
  • Const. Stage:
    Under Construction
  • Possession:
    Sep 2026
  • Parking:
    Open Reserved;
  • Floors:
    10
Developer Details

  • Developer:
    Reliance Corporation
  • Phone:
    02228086098
  • Website:
  • Address:
  • 2, Parvati Kunj, Daulat Nagar, Rd 7, Opp. Agarwal bungalow, Borivali(E), Mumbai-400066.
Project Ratings
Project Brochures
Brochures of Swastikby Reliance Corporation
Project Brochures
  • MPE/Brochures/31280/SWASTIK BRO 10.pdf
Project Amenities
Amenities offred in Swastik
LIFESTYLE AMENITIES
High speed elevatorsGrand entrance lobbyGymnasiumAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New Project
Proposed Possession 30 Sep 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations Yes
Project RERA Details
MAHA RERA No: P51800054494
RERA Project Name Swastik
RERA Location Near Vijay Sales, S V Road, Borivali West, Magathane, Borivali, Mumbai Suburban, 400092
RERA Developer Reliance Corporation
Project RERA Details
Project Type Others
Funding Bank ICICI BANK
Last Modified 16 Jan 2024
Last Retrived 16 Jan 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of Swastiklast updated on 16 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Swastik
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swastikby Reliance Corporationlast updated on 16 Jan 2025 as per information obtained from MARA RERA. Disclaimer

20133 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
0
Available
11

Saleable Area Statistics (Sq. ft.)

5479 Total
Total
5479
Booked
0
Available
5479
Total 11 apartments in project. 0 apartments booked. 0% apartments booked.
Total 508.99 saleable area. 0 apartments booked.
0% area booked.

A Wing Commercial

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Wing CommercialSep 202611010088
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL83.14 Sq.mts. ( 895 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL104.33 Sq.mts. ( 1123 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A Wing CommercialCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

B Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OWNER 2 BHK56.1 Sq.mts. ( 604 Sq.ft. )1
None Booked0% Booked
0% Booked
OWNER 2 BHK56.2 Sq.mts. ( 605 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B Wing ResidentialCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

C Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB 1 BHK30.54 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB 1 BHK30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE 1 BHK47.13 Sq.mts. ( 507 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C Wing ResidentialCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

D Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB 1 BHK24.35 Sq.mts. ( 262 Sq.ft. )2
None Booked0% Booked
0% Booked
REHAB 1 BHK30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB 1 RK21.33 Sq.mts. ( 230 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D Wing ResidentialCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked
Project Consultants
Channel Partners Registered by Developer
Reliance Corporation
for Project
Swastik
last updated on 16 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Reliance Corporation