Therese Project at Bandra West by Eken Constructions (P51800053034)
  • Rating:
  • ()

Therese - Bandra West

Project Details, Configuration & Prices
2 BHK700 Sq.ft. Carpet ₹ 3.85 Cr ++
2 BHK780 Sq.ft. Carpet ₹ 4.29 Cr ++
Project overview
Therese Project at Bandra West by Eken Constructions (P51800053034) is a RERA approved Under Construction Project with RERA ID P51800053034 slated to be ready for possession by Dec 2025 with 2 BHK apartments / Flats starting from ₹ 3.85 Crs onwards

Eken Constructions presents Therese, a premium residential project located on Waterfield Road in Bandra West, offering multi-sized 2BHK flats, duplexes, and studio apartments with possession expected by December 2025. The project boasts exclusive amenities including only two flats per floor for maximum privacy, two automatic lifts, a porch drive-in entrance, security systems, a yoga park on Terrace 1, a kids play area on Terrace 2, sound-resistant windows, and fire fighting systems compliant with MCGM norms. Additional features include rotating stack parking and quality pile foundation. Situated in Bandra West, the location offers convenient access to nearby attractions such as Patwardhan Park, National College, Bastian, Aroma Café, and places of worship within a short walking distance. Moreover, upcoming metro stations, shopping centers, and recreational facilities like Khar Gymkhana and Bandra Gymkhana are within a maximum 15-minute walk.
Therese QR Code
Therese
MahaRERA - P51800053034

Shanti Sadan

₹ 7.06 Crs. onwards
Bandra West
3 BHK apartments
View Details

Unique Shanti Finessia

₹ 9.99 Crs. onwards
Bandra West
4 BHK apartments
View Details

Rustomjee Parishram

₹ 41.58 Crs. onwards
Bandra West
4/Duplex BHK apartments
View Details

Park Reach

₹ 10.18 Crs. onwards
Bandra West
3 BHK apartments
View Details

Mayfair Muse

₹ 8.8 Crs. onwards
Bandra West
3/6 BHK apartments
View Details

Prestige Daffodils

₹ 17.46 Crs. onwards
Bandra West
3/4 BHK apartments
View Details

Turner House

₹ 12.75 Crs. onwards
Bandra West
Office BHK apartments
View Details

Vaswani Avania

₹ 4.27 Crs. onwards
Bandra West
2/4 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Therese
  • Location:
  • Bandra West, Waterfield Road
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2025
  • Floors:
    10
Developer Details

  • Developer:
    Eken Constructions
  • Phone:
    9820210093
  • Website:
  • Address:
  • 602, Eken Heights, Corner Of 21St And 33Rd Road, Corner Of 21St And 33Rd Road, Bandra West, 400050
Project Ratings
Project Brochures
Brochures of Thereseby Eken Constructions
Project Brochures
  • MPE/Brochures/31079/Therese Brochure Final CTC copy.pdf
Project Amenities
Amenities offred in Therese
LIFESTYLE AMENITIES
Kid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New Project
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800053034
RERA Project Name Therese
RERA Location Waterfield Road, Bandra (West), Bandra, Andheri, Mumbai Suburban, 400050
RERA Developer Eken Constructions
Project RERA Details
Project Type Others
Funding Bank HDFC
Last Modified 31 Jan 2024
Last Retrived 14 Jan 2025
Facilities & Amenities
Facilities, Amenities & Common areas details of Thereselast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approval
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approval
Landscaping & Tree Planting
As Per Approval
Open Parking1% completed
1% Complete
As Per Approval
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approval
Solid Waste Management And Disposal
As Per Approval
Storm Water Drains
As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approval
Water Supply
As Per Approval
Buildings / Wings in Therese
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Thereseby Eken Constructionslast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer

4410 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

22 apartments in total
Total
22
Booked
10
Available
12

Saleable Area Statistics (Sq. ft.)

13595 Total
Total
13595
Booked
5917
Available
7677
Total 22 apartments in project. 10 apartments booked. 45% apartments booked.
Total 1262.98 saleable area. 549.74 apartments booked.
44% area booked.

Therese

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ThereseDec 202571010024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.3 Sq.mts. ( 380 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK38.08 Sq.mts. ( 410 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK27.68 Sq.mts. ( 298 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK60.38 Sq.mts. ( 650 Sq.ft. )8
6 Booked75% Booked
75% Booked
2 BHK67.35 Sq.mts. ( 725 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK70.6 Sq.mts. ( 760 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK73.39 Sq.mts. ( 790 Sq.ft. )2
1 Booked50% Booked
50% Booked
EXISTING TENANT SHOP79.15 Sq.mts. ( 852 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING TENANT SHOP51.09 Sq.mts. ( 550 Sq.ft. )1
1 Booked100% Booked
100% Booked
22 total apartments / 10 apartments booked. 45% apartments booked.
Work Description in Building ThereseCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress37% done
37% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress70% done
70% Booked
Project Consultants
Channel Partners Registered by Developer
Eken Constructions
for Project
Therese
last updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Eken Constructions