Tribeca The Edge Project at Parel by Tribeca Developer (P51900032613)
  • Rating:
  • ()

Tribeca The Edge - Parel

Tribeca Developer
Project Details, Configuration & Prices
2 BHK800 Sq.ft. Carpet ₹ 4.07 Cr ++
3 BHK1279 Sq.ft. Carpet ₹ 6.49 Cr ++
Project overview
Tribeca The Edge Project at Parel by Tribeca Developer (P51900032613) is a RERA approved Under Construction Project with RERA ID P51900032613 slated to be ready for possession by Dec 2028 with 2/3 BHK apartments / Flats starting from ₹ 4.07 Crs onwards

Introducing The Edge by Tribeca & Tejukaya, a striking new landmark rising in the vibrant heart of Parel, Mumbai. This 50-storey tower, with its New York-inspired glass facade, redefines modern luxury living while paying homage to the city’s rich architectural heritage. Designed with meticulous attention to detail, each residence is a masterpiece of sophistication and style, combining cutting-edge design with timeless elegance. The Signature Tribeca Decks offer panoramic views of the Arabian Sea. At the same time, corner master bedrooms feature floor-to-ceiling windows on two sides, allowing natural light to flood in, creating a serene retreat. With sliding windows and elegant railings, Tribeca’s unique glass facades turn every bedroom into a balcony-like space, blurring the line between indoor and outdoor living. The expansive living rooms open onto generous decks, ideal for enjoying breathtaking vistas, and the jodi living rooms, with massive 100-square-foot decks, set a new benchmark for opulent living. The Edge also boasts a collection of "never before seen" amenities, including a glass-bottomed bridge that hovers 600+ feet above the city, an infinity swing, and a serene Jain Derasar. This iconic structure is more than just a residence—it’s a symbol of prestige and refined taste, where every element has been thoughtfully curated to offer a truly elevated lifestyle.
Tribeca The Edge QR Code
Tribeca The Edge
MahaRERA - P51900032613

Kalpataru Avana

₹ 13.49 Crs. onwards
Parel
4 BHK apartments
View Details

Crescent Bay - Tower 3

₹ 4 Crs. onwards
Parel
2/4 BHK apartments
View Details

Simana

₹ 3.87 Crs. onwards
Parel
2/3/4/5 BHK apartments
View Details

Neha Residency

₹ 2.21 Crs. onwards
Parel
2 BHK apartments
View Details

Ruparel Ariana

₹ 3.5 Crs. onwards
Parel
2/3/Duplex BHK apartments
View Details
Parel
BHK apartments
View Details

Ruparel Nova

₹ 3.25 Crs. onwards
Parel
2/3 BHK apartments
View Details

Ruparel Jewel

₹ 3.5 Crs. onwards
Parel
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2024
  • Project:
    Tribeca The Edge
  • Location:
  • Parel, Dr. Baba Saheb Ambedkar Road
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2028
  • Parking:
    Podium
  • Floors:
    50
Developer Details

Tribeca Developer

  • Developer:
    Tribeca Developer
  • Phone:
  • Website:
    https://www.tribecadevelopers.com/contact.php
  • Address:
  • 603 B, Piramal Tower, Peninsula Corporate Park, Lower Parel, Mumbai - 400013
Project Ratings
Project Brochures
Brochures of Tribeca The Edgeby Tribeca Developer
Project Brochures
  • MPE/Brochures/31225/brochure101.pdf
Project Amenities
Amenities offred in Tribeca The Edge
LIFESTYLE AMENITIES
Air Conditioned LobbyHigh speed elevatorsGrand entrance lobbyAluminium Sliding WindowsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New Project
Proposed Possession 31 Dec 2028
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2030
Litigations Yes
Project RERA Details
MAHA RERA No: P51900032613
RERA Project Name Tejukaya Pride
RERA Location Tejukaya Mansion, Dr.B.A.Road, Opposite Ganesh Gully, Lalbaug, Mumbai-400012, Lalbaug - Mumbai, Lalbaug - Mumbai, Tejukaya Mansion, Dr.B.A.Road, Opposite Ganesh Gully, Lalbaug, Mumbai-400012, Mumbai City, 400012
RERA Developer Tejukaya Corp Private Limited
Project RERA Details
Project Type Others
Funding Bank HDFC BANK LIMITED
Last Modified 18 Jan 2024
Last Retrived 14 Jan 2025
Facilities & Amenities
Facilities, Amenities & Common areas details of Tribeca The Edgelast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Tribeca The Edge
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tribeca The Edgeby Tribeca Developerlast updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer

108236 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

489 apartments in total
Total
489
Booked
3
Available
486

Saleable Area Statistics (Sq. ft.)

453207 Total
Total
453207
Booked
1258
Available
451949
Total 489 apartments in project. 3 apartments booked. 0% apartments booked.
Total 42103.94 saleable area. 116.86 apartments booked.
0% area booked.

Rehab Sale Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Sale WingDec 20282100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SALE SHOP TYPE 119.78 Sq.mts. ( 213 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 1010.08 Sq.mts. ( 109 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 1148.16 Sq.mts. ( 518 Sq.ft. )1
1 Booked100% Booked
100% Booked
SALE SHOP TYPE 1235.03 Sq.mts. ( 377 Sq.ft. )1
1 Booked100% Booked
100% Booked
SALE SHOP TYPE 1333.67 Sq.mts. ( 362 Sq.ft. )1
1 Booked100% Booked
100% Booked
SALE SHOP TYPE 149.55 Sq.mts. ( 103 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 1529.08 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 1636.49 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 210.59 Sq.mts. ( 114 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 316.4 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 417.37 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 514.45 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 68.95 Sq.mts. ( 96 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 75.07 Sq.mts. ( 55 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 827.94 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE SHOP TYPE 98.86 Sq.mts. ( 95 Sq.ft. )1
None Booked0% Booked
0% Booked
16 total apartments / 3 apartments booked. 18% apartments booked.
Work Description in Building Rehab Sale WingCompletion
Excavation
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress50% done
50% Booked
X number of Podiums
X number of Slabs of Super Structure

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Dec 20284011190511
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK TYPE 175.62 Sq.mts. ( 814 Sq.ft. )17
None Booked0% Booked
0% Booked
2 BHK TYPE 275.62 Sq.mts. ( 814 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK TYPE 375.62 Sq.mts. ( 814 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK TYPE 475.62 Sq.mts. ( 814 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK TYPE 573.3 Sq.mts. ( 789 Sq.ft. )34
None Booked0% Booked
0% Booked
2 BHK TYPE 672 Sq.mts. ( 775 Sq.ft. )35
None Booked0% Booked
0% Booked
2 BHK TYPE 7150.04 Sq.mts. ( 1615 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK TYPE 1110.74 Sq.mts. ( 1192 Sq.ft. )10
None Booked0% Booked
0% Booked
3 BHK TYPE 2110.93 Sq.mts. ( 1194 Sq.ft. )10
None Booked0% Booked
0% Booked
3 BHK TYPE 3111.02 Sq.mts. ( 1195 Sq.ft. )20
None Booked0% Booked
0% Booked
3 BHK TYPE 4115.38 Sq.mts. ( 1242 Sq.ft. )9
None Booked0% Booked
0% Booked
3 BHK TYPE 5115.38 Sq.mts. ( 1242 Sq.ft. )30
None Booked0% Booked
0% Booked
3 BHK TYPE 6102.56 Sq.mts. ( 1104 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK TYPE 1192.59 Sq.mts. ( 2073 Sq.ft. )1
None Booked0% Booked
0% Booked
228 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 1Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 20284211190511
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK TYPE 173.39 Sq.mts. ( 790 Sq.ft. )42
None Booked0% Booked
0% Booked
2 BHK TYPE 274.69 Sq.mts. ( 804 Sq.ft. )79
None Booked0% Booked
0% Booked
2 BHK TYPE 369.49 Sq.mts. ( 748 Sq.ft. )37
None Booked0% Booked
0% Booked
3 BHK TYPE 1113.9 Sq.mts. ( 1226 Sq.ft. )42
None Booked0% Booked
0% Booked
3 BHK TYPE 2111.39 Sq.mts. ( 1199 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK TYPE 3113.34 Sq.mts. ( 1220 Sq.ft. )37
None Booked0% Booked
0% Booked
SHOP TYPE 1336.09 Sq.mts. ( 3618 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 260.07 Sq.mts. ( 647 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 370.91 Sq.mts. ( 763 Sq.ft. )1
None Booked0% Booked
0% Booked
245 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 2Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Tribeca Developer
for Project
Tejukaya Pride
last updated on 14 Jan 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Tribeca Developer

Tribeca Developer